38 Standard Commissioning Process
Loading the BCON software
Install the Drive_loader_2_3_setup tool (or new) to local PC.
Connect PC to the assistant control panel (ACS-AP-W/S), through the USB to Mini
USB cable. Switch on the control power supply.