Huawei FusionDC1000B Quick Manual page 41

Prefabricated modular data center
Hide thumbs Also See for FusionDC1000B:
Table of Contents

Advertisement

No.M003 Monitoring Onsite Wiring Diagram (Video Surveillance Subsystem)
CT Rack
0KW
CT Rack
CT Rack
4KW
4KW
4KW
4KW
T&H-B2
T&H-B1
4KW
4KW
4KW
4KW
CT Rack
0KW
CT Rack
Abort
B
0KW
0KW
Connect terminals to the camera
cables, label the cables, and reserve
UIM20A-B1
the cables on the cable trays in B1.
0KW
Connect the cables to A1 onsite.
0KW
Connect the terminals to the
camera cables, label the cables, and
reserve the cables on the cable
trays in B1. Install the cameras
onsite.
Symmetrical twisted pair cable
Electronic power cable

Advertisement

Table of Contents
loading

Table of Contents