Huawei FusionDC1000B Quick Manual page 37

Prefabricated modular data center
Hide thumbs Also See for FusionDC1000B:
Table of Contents

Advertisement

No.M003 Monitoring Onsite Wiring Diagram (Access Control Subsystem)
CT Rack
4KW
4KW
T&H-B1
4KW
4KW
CT Rack
CT Rack
0KW
0KW
CT Rack
CT Rack
4KW
0KW
4KW
0KW
T&H-B2
4KW
0KW
4KW
0KW
Abort
B
Emergency door release button cable, reserved behind the outdoor
fire alarm horn strobe and connected using an interconnection
terminal
Connect terminals to the cables,
label the cables, and reserve the
cables on the cable trays in A1.
UIM20A-B1
Connect the cables to B1 onsite.
Cable trough image
Symmetrical twisted
pair cable
Electronic power cable

Advertisement

Table of Contents
loading

Table of Contents