Huawei FusionDC1000B Quick Manual page 39

Prefabricated modular data center
Hide thumbs Also See for FusionDC1000B:
Table of Contents

Advertisement

No.M003 Monitoring Onsite Wiring Diagram (Fire Extinguishing Subsystem)
CT Rack
0KW
CT Rack
CT Rack
4KW
4KW
4KW
4KW
T&H-B2
T&H-B1
4KW
4KW
4KW
4KW
CT Rack
0KW
CT Rack
Abort
B
0KW
0KW
Connect terminals to the cables,
UIM20A-B1
label the cables, and reserve the
0KW
cables on the cable trays in A1.
Connect the cables to B1 onsite.
0KW
Cable trough image
Symmetrical twisted
pair cable
Electronic power cable

Advertisement

Table of Contents
loading

Table of Contents