DIAG menu
Item
OPERATION TIME
SOFTWARE VERSION
TEST SIGNAL
...........................................................................................................................................................................................................
OPS: Optical Positioning Stabilizer
FLC: Ferro-Electric Liquid Crystal Shutter
1 REEL = 2000 feet of film running
Contents
The operation time of the following items is shown:
OPERATION TIME
SYSTEM
000 HOURS
FILM TRAVEL
35mm
000 REELS
16mm
000 REELS
THREADING
0000 TIMES
OPS
000 HOURS
AIR BLOW
000 HOURS
LAMP OPERATION TIME
POWER
000 HOURS
ON/OFF
0000 TIMES
FLC R
000 HOURS
FLC G
000 HOURS
FLC B
000 HOURS
FLC M
000 HOURS
The software version of the installed boards is shown.
Select ON/OFF of the test signal from the installed boards from
the list below. Select with the cursor buttons, then press the
SET button.
Board
TSG (IN side)
ADC
ON/OFF
MY
ON/OFF
CC
ON/OFF
VE
ON/OFF
EN
ON/0FF
IPM1
—
DHP1
—
OPM1
—
DCP1
ON/OFF
DSP1
ON/OFF
DCP2
ON/OFF
DSP2
ON/OFF
DP
ON/OFF
DIF
—
TSG (OUT side)
—
—
ON/OFF
—
—
ON/OFF
ON/OFF
ON/OFF
ON/OFF
—
ON/OFF
—
ON/OFF
ON/OFF
35