Installation Checklist; What This Chapter Contains; Checklist - ABB ACS880-207 Hardware Manual

Igbt supply units
Hide thumbs Also See for ACS880-207:
Table of Contents

Advertisement

Installation checklist

What this chapter contains

This chapter contains a list for checking the installation of the ACS880-207 IGBT supply
unit.

Checklist

Check the mechanical and electrical installation of the drive before start-up. Go through
the checklist together with another person.
Disconnect the drive from the AC power line and make sure it is safe to start the work. See
section
Electrical safety precautions
WARNING! Only qualified electricians are allowed to do the work described in this
chapter. Read the safety instructions given in Safety instructions for ACS880
multidrive cabinets and modules (3AUA0000102301 [English]). Ignoring the
instructions can cause physical injury or death, or damage to the equipment.
Make sure that...
The ambient operating conditions meet the specifications given in chapter
The unit is properly fastened to the floor. See Mechanical installation instructions for ACS880
multidrive cabinets (3AUA0000101764 [English]).
The cooling air flows freely.
There is sufficient free space around the unit. See Mechanical installation instructions for ACS880
multidrive cabinets (3AUA0000101764 [English]).
on page 42.
Installation checklist 61
4
Technical
data.

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents