4 INSTALLATION, WIRING AND MAINTENANCE OF THE PRODUCT

4.1 Outline of installation, wiring and maintenance

4.1.1 Installation, wiring and maintenance procedures

STEP 1
Preparation
Refer to
Section 4.1
STEP 2
Installing the
Refer to
module
Section 4.2
STEP 3
Refer to
Section 4.3
Wiring the
module
STEP 4
Refer to
Section 4.3
Confirming the
STEP 5
installation and
wiring
Refer to
Section 4.4
STEP 6
Refer to
Section 4.5
Servicing the
module
STEP 7
Refer to
Section 4.5
The outline and procedures for QD75 installation, wiring and maintenance are shown
below.
Understand the "Handling precautions" and
"Names of each part" of the module (QD75)
Install the module (QD75) on the base unit.
Wire the external device connection
connector pins, and assemble the connector.
Connect the cable to the module (QD75)
Confirm the connection
Operation of the positioning system.
Carry out maintenance
Dispose of the QD75
The cables used to connect the QD75 with the
drive unit, with the mechanical system input
(each input/output signal), and with the manual
pulse generator are manufactured by soldering
each signal wire onto the "external device
connection connector" sold separately.(Refer to
"Applicable connector for external wiring" in
Section 3.1 "Performance specifications" for
the optional connector.)
Wire and connect the manufactured cable to QD75
after reading the precautions for wiring.
Check the connection using GX Configurator-QP.
Carry out maintenance as necessary.
When the QD75 is no longer necessary,
dispose of it with the specified methods.
4 - 2
MELSEC-Q

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents