Unpacking And Checking - Huawei DBS3900 Installation Manual

Lampsite
Hide thumbs Also See for DBS3900:
Table of Contents

Advertisement

DBS3900 LampSite
Installation Guide
This section describes how to unpack and check the delivered equipment to ensure that the
materials are complete and intact.
Context
You must power on the RHUB or pRRU within 7 days after it is unpacked.
Procedure
Step 1 Count the total number of the shipments.
If...
The total number of the components is
consistent with that recorded in the
packing lists on all packing boxes
The total number of the components is
inconsistent with that recorded in the
packing lists on all packing boxes
Step 2 Check the exterior of each packing box.
Issue 06 (2015-10-30)
3
NOTE
The following lists important notes when you are transporting, lifting, or installing the equipment or
components:
l
Protect them from colliding with doors, walls, shelves, or other objects.
l
Wear clean gloves and do not touch them with bare hands, sweat-soaked gloves, or dirty gloves.
NOTICE
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.

Unpacking and Checking

Then...
Go to
Step
Report the problems and causes to the local
Huawei office.
3 Unpacking and Checking
2.
7

Advertisement

Table of Contents
loading

Table of Contents