This chapter describes the pRRU3907 installation process.
9.1 Information About the Installation
This section describes the information that you must be familiar with before installing a
pRRU3907, including the pRRU3907 product family, installation scenarios, installation space
and environment requirements.
9.2 Installation Process
This section describes the pRRU3907 installation process, which involves installing a
pRRU3907, and cables, checking the pRRU3907 hardware installation, and powering on the
pRRU3907.

9.3 Installing a pRRU3907

This section describes the pRRU3907 installation process.
9.4 Installing pRRU Cables
This chapter describes the procedures for installing pRRU cables.
9.5 Checking the pRRU3907 Hardware Installation
pRRU3907 hardware installation checking includes hardware and cable installation checking.
9.6 Powering on the pRRU3907
This section describes the power-on check on the pRRU3907 after the pRRU3907 hardware is
installed and checked.
Issue 06 (2015-10-30)
9
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
Installing a pRRU3907
9 Installing a pRRU3907
133

Advertisement

Table of Contents
loading

Table of Contents