Electrical Requirements; Venue Fit™ Power Requirements; Inrush Current; Site Power Outlets - GE Venue Fit Technical Publication

Table of Contents

Advertisement

P R E L I M I N A R Y
DIRECTION 5854713-100, REVISION 2
2-2-5

Electrical Requirements

NOTE:
GE requires a dedicated mains power line and Ground for the proper operation of its Ultrasound
equipment. This dedicated power line shall originate at the last distribution panel before the
system.
Sites with a mains power system with defined Neutral and Live:
The dedicated line shall consist of one phase, a neutral (not shared with any other circuit), and a full
size Ground wire from the distribution panel to the Ultrasound outlet.
Sites with a mains power system without a defined Neutral:
The dedicated line shall consist of one phase (two lines), not shared with any other circuit, and a full
size Ground wire from the distribution panel to the Ultrasound outlet.
NOTE:
Please note that image artifacts can occur, if at any time within the facility, the Ground from the
main facility's incoming power source to the Ultrasound unit is only a conduit.
2-2-5-1
Venue Fit™ Power Requirements
Electrical specifications for the Venue Fit™ system are as follows:
Table 2-3
Input Voltage
90V AC to 240V AC
2-2-5-2

Inrush Current

Inrush current is not a factor for consideration, due to the inrush current limiting properties of the power
supplies.
Voltage
230 VAC
2-2-5-3

Site Power Outlets

A dedicated AC power outlet must be within reach of the unit without requiring the use of extension
cords. Other outlets adequate for the external peripherals, medical and test equipment required to
support this unit must also be present and located within 1 m (3.2 ft) of the unit. Electrical installation
must meet all current local, state, and national electrical codes.
2-2-5-4

Mains Power Plug

The Venue Fit™ portable ultrasound scanner is supplied with an AC power cable, as standard. In the
event that the unit arrives without a power cable, or a power cable fitted with an incorrect plug, contact
your GE dealer. When necessary, the installation engineer will supply the appropriate power plug to
meet the applicable local regulations.
Electrical Requirements
Tolerances
±10%
Inrush Current
(Console Only)
<80A
Chapter 2 - Site Preparations
Op. Current
Frequency
2.5A
47~63Hz
RMS@115VAC
VENUE FIT™ SERVICE MANUAL
2-3

Advertisement

Table of Contents
loading

Table of Contents