Front Panel - Cisco SCE 2000 4xGBE Installation And Configuration Manual

Cisco systems sce 2000 platform installation and configuration guide
Table of Contents

Advertisement

Front Panel

Front Panel
The SCE 2000 Front Panel consists of ports and LEDs as shown in the following figure and
tables.
Figure 2-1: SCE 2000 Front Panel
Table 2-2
Port
Mng1/
Mng2
Console
AUX
GBE ports 1-4 4
Cisco SCE 2000 4xGBE Installation and Configuration Guide
2-2
SCE 2000 Ports
Quantity
Description
2
10/100/1000 Ethernet RJ-45 ports for
management of the SCE 2000.
CLI designation: interface Management
0/1, 0/2.
1
RS-232 RJ-45 port for use by technicians A local terminal (console)
1
RS-232 RJ-45 port used by technicians
GigabitEthernet SC ports for connecting
to the line and/or cascading two devices
CLI designation: interface
GigabitEthernet 0/1 through 0/4
Chapter 2
Introduction to the SCE Platform
Connect This Port To...
A LAN using an FE cable
with an RJ-45 connector.
If both interfaces are used to
provide a redundant
management interface,
connect both ports to the LAN
via a switch.
using an RS-232 cable with
an RJ-45 connector, as
provided in the SCE 2000 kit.
Refer to
Connecting the Line
Ports
(on page 6-1) for
cabling diagrams for various
topologies
OL-7824-04

Advertisement

Table of Contents
loading

Table of Contents