Honeywell NOTIFIER NFC-50/100 Instruction Manual page 26

Table of Contents

Advertisement

Installation
cable to TB15. Refer to Figure 2.6 for the location of the stud. Apply AC power to the panel only after the system is completely installed
and visually checked. Note that AC power must be applied to the panel before installing the battery interconnect cable (refer to the fol-
lowing section).
Grounding
Cable #71073
Equipment
Ground
26
grounding stud
grounding stud
Figure 2.6 Earth Ground Connection
Notifier FirstCommand Series Manual — P/N LS10001-001NF-E:H 1/8/2018
keps nuts
Operating Power

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Notifier nfc-50/100eNotifier firstcommand seriesNotifier firstcommand nfc-50/100Notifier firstcommand nfc-50/100e

Table of Contents