Vent Termination Clearances - Honeywell Flare Front Series Installation Manual

Table of Contents

Advertisement

VENT TERMINATION CLEARANCES

*12" (30 cm) min.
A
*12" (30 cm) min.
B
12" (30 cm) min.
C
**24" (61 cm) min. for Flare units 100"
D
**18" (46 cm) min. for Flare units 80" and below
(vinyl surfaces require 24" (61 cm) min.)
30" (76 cm) min. for Flare units 80" and 100"
E
18" (46 cm) min. for Flare units 70" and below
(vinyl surfaces require 24 inches (61 cm) min.)
6" (15 cm) min.
F
6" (15 cm) min.
G
3' (90 cm) min.
H
I
3 feet (90 cm) min.
J
*12 inches (30 cm) min.
K
*6 feet (1.8 m) min.
L
*7 feet (2.1 m) min.
**24" inches (76 cm) min. for Flare units 100"
M
**18" inches (46 cm) min. for Flare units 80" and
below (vinyl surfaces require 24 inches (61 cm)
min.)
36 |
P a g e
Clearances above grade, veranda, porch, deck, or balcony
Clearance to window or door that may be opened
Clearance to permanently closed window recommended to prevent
condensation on window
Vertical clearance to ventilated soffit located above the terminal within a
horizontal distance of 2 feet (60 cm) from the edge of the terminal
Clearance to unventilated soffit.
Clearance to outside corner
Clearance to inside corner
*Not to be installed above a meter/regulator assembly within 3 feet (90 cm)
horizontally from the centerline of the regulator
Clearance to service regulator vent outlet
Clearance to non-mechanical air supply inlet to building or the combustion air
inlet to any other appliance
Clearance to a mechanical air supply inlet
^ Clearance above paved sidewalk or a paved driveway located on public
property
Clearance under veranda, porch, deck, or balcony

Advertisement

Table of Contents
loading

Table of Contents