Chapter 4 I&C Proces - Cisco BWX 8305 Installation And Commissioning Manual

Table of Contents

Advertisement

Chapter 4
I&C Process
4.5 Commissioning
OL-16336-02
Commissioning – (for each BS at the cell site)
C
C
Power up the BS.
Power up the BS.
Change the boot-line parameters
Change the boot-line parameters
to point to the BS record i n the
to point to the BS record i n the
Test EMS.
Test EMS.
Resume the boot
Resume the boot
Wait 5 min after boot completes.
Wait 5 min after boot completes.
Make sure that there are no
Make sure that there are no
outstanding alarms and that the BS
outstanding alarms and that the BS
is stable (not resetting)
is stable (not resetting)
Perform 3 full calibrations
Perform 3 full calibrations
If not successful,
If not successful,
troubleshoot
troubleshoot
and repeat
and repeat
Y
Y
Perform the RF Verification
Perform the RF Verification
If not successful,
If not successful,
troubleshoot
troubleshoot
and repeat
and repeat
Y
Y
Perform the Location Test
Perform the Location Test
and the Single Antenna
and the Single Antenna
Element test
Element test
not successful,
not successful,
troubleshoot,
troubleshoot,
recalibrate and
recalibrate and
Perform the Drive Test
Perform the Drive Test
Complete the I&C Closeout Tool
Complete the I&C Closeout Tool
N
N
Gather all the Closeout
Gather all the Closeout
documentation files and zip them
documentation files and zip them
Take pictures
Take pictures
Gather all the Closeout
Gather all the Closeout
documentation files and zip them
documentation files and zip them
N
N
to Operator
to Operator
NOW YOU CAN CUT THE BS
NOW YOU CAN CUT THE BS
OVER TO THE PRODUCTION
OVER TO THE PRODUCTION
BWX 8305 Basestation Installation and Commissioning Guide
Commissioning
If
If
N
N
repeat
repeat
Y
Y
D
D
EMS
EMS
4-5