Planning, Preparation and Pre-Configuration
4.2 Planning, Preparation and Pre-Configuration
Planning & Preparation
BWX 8305 Basestation Installation and Commissioning Guide
4-2
Start
Start
Complete Project Plan
Complete Project Plan
(Program or Project Manager)
(Program or Project Manager)
Generate the
Generate the
RF coverage prediction map
RF coverage prediction map
(RF Engineer)
(RF Engineer)
Conduct site survey &
Conduct site survey &
complete the
complete the
Site Candidate
Site Candidate
Evaluation Form
Evaluation Form
Complete the
Complete the
Interference Analysis
Interference Analysis
Complete the Site Design
Complete the Site Design
(Site Planner)
(Site Planner)
Complete the
Complete the
Complete the
Complete the
Network Architecture design
Network Architecture design
Network Architecture design
Network Architecture design
Network Planning)
Network Planning)
(Network Planner)
(Network Planner)
Select which cables to use
Select which cables to use
(RF, CAL and GPS)
(RF, CAL and GPS)
Develop the Bill of Materials.
Develop the Bill of Materials.
Acquire all equipment, materials,
Acquire all equipment, materials,
documents, and forms
documents, and forms
Chapter 4
I&C Process
Pre-Configuration
Install & configure
Install & configure
the "production"
the "production"
EMS Server & Client
EMS Server & Client
If not already in place
If not already in place
Install & configure
Install & configure
the 'test'
the 'test'
EMS Server & Client
EMS Server & Client
on your laptop
on your laptop
Add additional Global Config
Add additional Global Config
parameters as required by your
parameters as required by your
company (if needed)
company (if needed)
Add & configure a record
Add & configure a record
for each CPE to be used during
for each CPE to be used during
the commissioning tests.
the commissioning tests.
A
A
THE INSTALLER WILL DO
THE INSTALLER WILL DO
ALL THE FOLLOWING
ALL THE FOLLOWING
TASKS USING THE TEST
TASKS USING THE TEST
EMS. THEN, WHEN THE BS
EMS. THEN, WHEN THE BS
IS UP AND RUNNING AND
IS UP AND RUNNING AND
ALL THE TESTS HAVE BEEN
ALL THE TESTS HAVE BEEN
COMPLETED, THE BS IS
COMPLETED, THE BS IS
"CUT OVER" TO THE
"CUT OVER" TO THE
PRODUCTION EMS
PRODUCTION EMS
OL-16336-02