GE SE 250 Mighty Small II Operating Instructions Manual page 35

Table of Contents

Advertisement

Step
1
2
SE 250/260 Mighty Small II Operating Instructions 29281629 AA
Action
Rinse away the overlay with distilled water and drain any excess water.
If installing a self-cast or precast 10 × 8 cm gel sandwich, align the bottom
of the plate with the bottom of the core (see figure below). The bottom of
the notched plate must cover the silicone rubber gasket. The 10 × 8 cm gel
sandwich fits flush with the bottom of the upper buffer chamber core.
If installing a self-cast or precast 10 × 10.5 cm gel sandwich, orient the
sandwich so that the notched plate faces the gasket, notches at the top.
Set the bottom of the sandwich on the supporting ledges in the bottom of
the lower chamber and center the plate so that the gasket seals both sides
(see figure below). The 10 × 10.5 cm gel sandwich fits against the bottom of
the lower buffer chamber.
5 Operation
5.2 Assembly
35

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Se 260 mighty small ii

Table of Contents