Installation - GE SE 250 Mighty Small II Operating Instructions Manual

Table of Contents

Advertisement

4 Installation

4
Installation
About this chapter
This chapter provides required information to enable users and service personnel to
unpack the SE 250/260 Mighty Small II instrument.
Safety precautions
Unpacking procedure
Unwrap all packages carefully.
Inspect all visible parts for damage or missing pieces. If any damage is observed, record
this on the receiving documents and inform your GE representative. Make sure to keep
all packing material for damage claims or to use should it become necessary to return
the unit.
28
CAUTION
When lifting and moving the instrument be careful not to drop it.
This may cause injury.
CAUTION
Make sure that the system is placed on a stable, level bench with
adequate space for ventilation.
SE 250/260 Mighty Small II Operating Instructions 29281629 AA

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Se 260 mighty small ii

Table of Contents