3.1 Preparation
Installation sequence
Table 3-1
lists the overall installation steps. Details are provided in the indicated sections.
Step
Perform mechanical installation of transmitter and probe.
1
Connect transmitter wiring and power.
2
After Installation check the transmitter's configuration and tune if necessary. Transmitters
that were ordered using Honeywell's SmartLine Application and Validation Tool (AVT) will
come with parameters pre-loaded so that the transmitter will give accurate level
measurements out-of-the-box. Refer to SLG 700 HART Option Manual, #34-SL-25-06 or the
SLG 700 FOUNDATION Fieldbus manual, #34-SL-25-07.