AEG AS-IC01-2 Series Installation Instructions Manual page 39

Three-phase grid-tied solar inverter 12 kw to 30 kw
Hide thumbs Also See for AS-IC01-2 Series:
Table of Contents

Advertisement

38
Setting item
Setup Date/Time
Language
Select Country
Setup mode
PD201808 AEG GRID-TIED THREE-PHASE SOLAR INVERTER (12-30 kW) V.2-18 EN
LCD display
S e t u p D a t e / T i m e
D a t e : 2 0 1 2 / 0 1 / 1 5
1
T i m e : 1 2 : 1 4 : 3 0
Curr. Language : English
English
Dutch
Chinese
German
Country
:
Australia
Germany
Greece
England
Denmark
Australia
Holland
S e t u p M o d e l : I n d e p e n d
I n d e p e n d
P a r a l l e l
Instruction
next line. After editing the four digits, press "ENT" to save
the edition and press "ESC" to exit.
The currency types include EUR, POD, CNY and USD.
Access the interface and edit the date and time through
" " or " ". Then press "ENT" again to edit the next line.
After editing the four digits, press "ENT" to save and press
"ESC" to exit.
Access the interface and edit the language through " " or
" ". Then press "ENT" again to save the edition and press
"ESC" to exit. The default language is English.
Access the interface and select country through " " or
" ". And then press "ENT" again to save the edition and
press "ESC" to exit.
The DC input mode includes "independent" and "parallel":
"independent mode" is the independent MPPT of Track A
and Track B; "parallel mode" is the parallel MPPT of Track A
and Track B. The default mode is "independent".
The input mode setting is invisible if the inverter is in
power generation mode. It is only available when the DC
power is on and the AC power is turned off
Press " " or " " to select the setting mode and press
"ENT" to save the setting or "ESC" to return.
If the situation of section 5.4.8 occurs, it is necessary to
switch the DC input to "parallel" mode.
38

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents