31
9. Install the screws and cover of cooling bin or fan box to their original position.
10. Install the inverter back to its original position as described in section 3.
11. Repeat the operations in section 4.1.
12. Restart the inverter.
5. Display panel
This section describes the panel display and provides instructions for display operation, including the LED indicators and
the LCD display. The LED indicators and the LCD display show the operation states and parameters. The displayed
content and parameters can also be set or modified by the operational panel.
5.1 LED indicators
There are three LED indicators on the panel:
1.
"Run", operation indicator, green;
2.
"Warn" recoverable fault indicator, yellow;
3.
"Fault", unrecoverable fault indicator, red.
PD201808 AEG GRID-TIED THREE-PHASE SOLAR INVERTER (12-30 kW) V.2-18 EN
If the inverter sends an alarm signal and stops, do not restart it before all faults
have been ruled out. Check carefully according to all steps described in Section 4.1
p
A l a r m
Figure 16A: AS-IC01-2 Operation Panel
V - p v 1 : 0 0 0 . 0 V
I - p v 1 : 0 0 0 . 0 A
V - p v 2 : 0 0 0 . 0 V
h
0 1 . A 0 0 1
MENU
LCD screen
LED indicators
Operational panel
31