S1 RELAY SETUP
3 Series IEC 61850
GOOSE details
6–14
The 339 firmware supports IEC61850 GOOSE communications on the optional
communications daughter board.
Portions of the IEC61850 standard not pertaining to GOOSE, are not implemented in the
339 .
Manufacturing Message Specification (MMS) standard ISO/IEC 9506 is only supported
when GOOSE type is set to "Advanced" (under
GOOSE CONFIGURATION > TRANSMISSION
includes IEC 61850.
The 339 does not support
the mapping of analogue values to data points in data sets in either the transmit or
receive direction
a file system to maintain SCL, ICD or CID files, for IEC61850 GOOSE. As such the
implementation stores GOOSE configuration using MODBUS set points.
Configuration of transmission and reception settings for the GOOSE feature are performed
using EnerVista 3 Series Setup software.
The 339 firmware accepts GOOSE messages from UR, F650 and UR Plus. The
interoperability with other manufacturers will be guaranteed in almost all cases, by
implementing the reception side with nested structures (one level of nesting) and all the
standard data types.
GOOSE settings changes will take effect only after the 339 is re-booted. One setting is
available to Enable/Disable both Transmission and Reception. It is possible to change this
setting from the Front Panel of the relay.
Figure 6-9: EnerVista 3 Series GOOSE General Settings
S1 RELAY SETUP > COMMUNICATIONS >
) and the Communications order code option
339 MOTOR PROTECTION SYSTEM – INSTRUCTION MANUAL
CHAPTER 6: SETPOINTS

Advertisement

Table of Contents
loading

Table of Contents