GE AKTA avant User Manual page 121

Hide thumbs Also See for AKTA avant:
Table of Contents

Advertisement

Location and illustration
The following illustration shows the recommended positions for the external air sensors.
1
Part
1
2
Note:
Connect tubing
L9-1.5
Connection
between...
L9-1.5 and V9-IS or
V9H-IS
ÄKTA avant User Manual 29035184 AE
Function
L9-1.5 external air sensor before Sample inlet valve
L9-1.2 external air sensor after Injection valve
Only one external air sensor can be installed at a time.
Tubing
label
L
4 Optional instrument modules
2
Tubing
FEP, o.d. 1/8", i.d.
1.6 mm
4.6 External air sensors
Connector
Tubing connector,
5/16" + Ferrule
(yellow), 1/8"
Tubing
length
(mm)
200
121

Advertisement

Table of Contents
loading

Table of Contents

Save PDF