Preventive maintenance checkout procedures

FRU replacement checkout procedures

2001989-203C
Perform ApexPro Channelized Telemetry System receiver check.
Channelized Telemetry System receiver check on page 8-15.
Perform power fail alarm verification test (power).
verification test (power) on page 8-16.
Perform ground continuity test.
Perform ground (earth) wire leakage current tests.
leakage current tests on page 8-16.
Perform enclosure (chassis) leakage current tests.
leakage current test on page 8-17.
Verify that the Remote Service agent is enabled.
agent on page 5-12.
Use the following checklist to ensure completion of all preventive maintenance and
checkout procedures.
Perform general visual inspection.
Clean external surfaces.
Inspect power supply.
Clean internal components.
Clean fans.
See Fans and filters on page 8-11.
Clean filters.
See Fans and filters on page 8-11.
Perform installation check.
Perform disk check.
See Disk check on page 6-17.
Perform ApexPro Channelized Telemetry System receiver check.
Channelized Telemetry System receiver check on page 8-15.
Perform power fail alarm verification test (power).
verification test (power) on page 8-16.
Perform ground continuity test.
Perform ground (earth) wire leakage current tests.
leakage current tests on page 8-16.
Perform enclosure (chassis) leakage current tests.
leakage current test on page 8-17.
Verify that the Remote Service agent is enabled.
agent on page 5-12.
Use the following checklist to ensure completion of all FRU replacement checkout
procedures.
Perform general visual inspection.
ApexPro™ Telemetry
See Ground continuity test on page 8-13.
See Enable the Remote Service
See General inspection on page 8-7.
See External surfaces on page 8-9.
See Check for power supply problems on page 6-3.
See Internal components on page 8-11.
See Perform installation check on page 5-16.
See Ground continuity test on page 8-13.
See Enable the Remote Service
See General inspection on page 8-7.
Checkout
See ApexPro
See Power fail alarm
See Ground (earth) wire
See Enclosure (chassis)
See ApexPro
See Power fail alarm
See Ground (earth) wire
See Enclosure (chassis)
8-3

Advertisement

Table of Contents
loading

Table of Contents