7.3.1.3 Performing a Capacity Test

Context
This item allows you to fully discharge batteries. A deep discharge test is
conducted to obtain the battery discharge performance data.
Before performing a capacity test, ensure that:
● If the battery has been replaced, choose System Info > Settings > Battery
● The UPS is working in normal mode; float charging or hibernation has lasted
● The UPS does not generate any battery overtemperature, overvoltage, or
● The mains, batteries, charger, and discharger are normal. No overload alarm is
Procedure
Step 1 On the home screen of the LCD, choose System Info > Maintenance > Battery
Maint.
Step 2 Tap Start on the right of Capacity Test to start a capacity test.
Issue 02 (2024-01-05)
NO TE
When the battery test is completed normally, the test data is used as common test data.
Record the data obtained from the latest five tests.
The shallow discharge test automatically stops in any of the following cases:
● The battery discharge capacity reaches the specified value (10%–50%, 20% by default).
● The discharge voltage reaches the warning threshold (calculated in real time).
● The load rate fluctuation exceeds 10%.
● A fault alarm is generated.
NO TICE
Settings on the LCD and verify that the value of Installation time has been
changed based on the actual situation.
for 2 hours after the SOC reaches 100%; the load rate fluctuation is less than
10%.
overcurrent alarm. No generator is connected to the UPS.
generated.
Copyright © Huawei Digital Power Technologies Co., Ltd.
7 Routine Maintenance
110

Advertisement

Table of Contents
loading

This manual is also suitable for:

Fusionpower6000 ups5000-h-600 kva-ftm

Table of Contents