Step 1 Determine the cable end for the corresponding components based on the
information about the signal cable terminal block. Ensure that the cable length is
sufficient for crimping and slack is ensured.
Step 2 Identify the positive and negative terminals of power and signal cables based on
the cable labels. Crimp the terminals from left to right based on the terminal
definitions.
Step 3 Check them after the crimping is complete.
----End
3.6.5 Installing Fan Cables
Context
Cables inside the heat exchanger module and fan module have been connected
before delivery. You only need to connect the interconnection terminals of the fan
power cables, signal cable, and NTC cable onsite.
Procedure
Step 1 Determine the cable route.