4
PROCEDURE BEFORE OPERATION
This chapter shows the procedure before operation of an MES interface module.
Operating procedure
1.

Starting a server

Start a server used as a database server or application server.
(Page 56 Starting a Server)
2.
Starting an MES interface module and a configuration personal computer
Start an MES interface module, and a configuration personal computer on which MES Interface Function Configuration Tool is
used.
(Page 59 Starting an MES Interface Module and Configuration Personal Computer)
4.1
Starting a Server
: No operation required
Step
Database server
(Access type: Direct DB connection)
1
Create a table in a relational database.
2
3
4
5
Start the operation.
*1 Set it when using the program execution function. (MELSEC iQ-R MES Interface Module User's Manual (Application))
*2 After installing a relational database, restart a server then create a table.
*3 Page 83 INSTALLATION AND UNINSTALLATION
• Be sure to log on to an application server with a created account for application program execution once
before using the program execution function on the application server.
• For using an application server when using the program execution function, log on with an account other
than a created one for the application program execution function.
4 PROCEDURE BEFORE OPERATION
56
4.1 Starting a Server
Database server
(Access type: Connection via service)
*2
Configure the ODBC setting for the database.
Install DB Connection Service and DB Connection Service Setting Tool.
Change the setting for DB Connection Service.
*1
Application server
Prepare an application program to run.
Create an account for running the application
program.
*3