Toro Workman 07142 Operator's Manual page 8

Cab kit gtx utility vehicle
Hide thumbs Also See for Workman 07142:
Table of Contents

Advertisement

4.
Install a new floor-plate support using 8
flange-head bolts (5/16 x 1-1/4 inches) and 8
flange nuts (5/16 inch) as shown in
Note:
Torque the flange-head bolts (5/16 x
1-1/4 inches) to 34 N∙m (25 ft-lb).
Figure 5
1. Flange nut (5/16 inch)
2. Flange-head bolt (5/16 x
1-1/4 inches)
5.
Remove the other existing floor-plate support
(Figure
4).
6.
Install the other new floor-plate support using 8
flange-head bolts (5/16 x 1-1/4 inches) and 8
flange nuts (5/16 inch) as shown in
7.
Install the previously removed 4 screws (1/4 x
1-1/4 inches) and 4 nuts (1/4 inch) into the floor
plate
(Figure
2).
Figure
5.
g035247
3. Floor-plate support
Figure
5.
8.
Using the new floor-plate supports as a guide,
drill 3 holes (3/8-inch diameter) into each floor
plate
(Figure
6).
Important:
Drill only the front 2 holes on the
new floor-plate supports and the farthest,
rear hole; as shown in
1. Do not drill this hole.
9.
Loosely attach the left and right cab supports
to the machine using the hex-head bolts (3/8 x
1-1/4 inch), washers (3/8 inch), and flange nuts
(3/8 inch) as shown in
Note:
Do not tighten the bolts at this time.
1. Hex-head bolt (3/8 x 1-1/4
inch)
2. Cab support
8
Figure
6.
Figure 6
2. Front of the machine
Figure
7.
Figure 7
3. Flange nut (3/8 inch)
4. Washer (3/8 inch)
g038352
g037135