Floor-Plate Support; Flange-Head Bolt (5/16 X 1-1/4 Inches); Flange Nut (5/16 Inch); Left Cab Support - Toro Workman 07142 Operator's Manual

Cab kit gtx utility vehicle
Hide thumbs Also See for Workman 07142:
Table of Contents

Advertisement

5
Installing the Supports
Parts needed for this procedure:
2

Floor-plate support

16

Flange-head bolt (5/16 x 1-1/4 inches)

16

Flange nut (5/16 inch)

1

Left cab support

1

Right cab support

4

Hex-head bolt (3/8 x 1-1/4 inch)

4

Flange nut (3/8 inch)

4

Washer (3/8 inch)

Procedure
1.
Remove the 4 screws (1/4 x 1-1/4 inches) and 4
nuts (1/4 inch) from the floor plate
1. Nut (1/4 inch)
2. Screw (1/4 x 1-1/4 inches)
(Figure
Figure 2
3. Floor plate
2.
Use a floor jack under the frame to support the
front of the machine
1. Frame
3.
Remove 1 of the existing floor-plate supports
(Figure
Important:
2).
existing floor-plate supports simultaneously.
1. Existing floor-plate supports
g038333
7
(Figure
3).
Figure 3
4).
Do not remove both of the
Figure 4
g038334
g035246