STEP 1: ASYD - System Data 1, Index 42,
STEP 2: ARTD - Assign the incoming TIE Line route.
<Example of 2 - WIRE E&M/4 - WIRE E&M>
RT : 2
1-OSGS
6-TCL
Data other than the above should be set "0" (default data).
<LCR (S) DUMMY ROUTE>
RT : 31
6-TCL
Data other than the above should be set "0" (default data).
STEP 3: ARRC - Allow trunk-to-trunk connection between the incoming route and the outgoing route in
:7/6 2-ONSG
: 3
: 4
7-L/T
: 1
: 4
7-L/T
: 1
which INTER-OFFICE OFF-HOOK QUEUING will apply. Also allow trunk-to-trunk
connection between the incoming route and the LCR (S) dummy route. Assign both of
these for ARI: D. The outgoing route and the LCR (S) dummy route must be programmed
to allow OUTGOING TRUNK QUEUING [0-2]. Ensure that CDN 9, TQ = 1 (Trunk
Queuing) is set for that outgoing route.
INTER-OFFICE OFF-HOOK QUEUING-PRI
bit 7: This bit must be assigned as data "0", continuous
Service Set Tone.
3-ISGS
:7/6 4-INSG
8-RLP
: 2
15-LSG
9-TQ
: 1
13-AC
NDA-24305
: 3
5-TF
: 3
: 5
41-TDMQ : 1
: 1
41-TDMQ : 1