iSitePower-M (MAP05A1, MAB05B1)
User Manual
Figure 6-4 Marking mounting holes for the base
Step 3 Mark the mounting holes for battery modules.
Figure 6-5 Marking the mounting holes for battery modules
Step 4 Drill holes and install expansion bolts.
When drilling holes, avoid the water pipes and power cables buried in the wall.
Issue 02 (2021-12-30)
D ANGER
Copyright © Huawei Digital Power Technologies Co., Ltd.
6 System Installation
46