Power-On; Soc Changes; Checking Cable Connections When The Product Fails To Be Upgraded; Wifi Qr Code Scanning - Huawei iSitePower-M User Manual

Hide thumbs Also See for iSitePower-M:
Table of Contents

Advertisement

iSitePower-M (MAP05A1, MAB05B1)
User Manual

10.5 Power-On

Do not touch the manual ON/OFF switch during the installation. Otherwise,
electric shocks may occur.

10.6 SOC Changes

How does the SOC change from 99% to 100% when the battery is about to be
fully charged?
When the SOC is greater than 99%, the battery switches to float charging and the
charge current decreases gradually until the SOC reaches 100%.
10.7 Checking Cable Connections when the Product
Fails to Be Upgraded
If the product fails to be upgraded, check the cable connections. Ensure that the
cables are correctly connected and perform the upgrade again.

10.8 WiFi QR Code Scanning

Scan the QR code on the device to connect to the WiFi. If the connection fails,
contact your installer.
10.9 Querying the Battery Capacity in the Parallel
System Scenario
Query the total system capacity on the app.
10.10 Conflict Between the LAN IP Address of the
Router and the IP Address of the Product
If the IP address of the product conflicts with the LAN address of a home WiFi
router, the connection between the NMS and the mobile app may fail. Before
connecting the iSitePower-M to the NMS through a home WiFi router, check the
LAN IP address of the router. The IP address cannot be 192.168.0.X, 192.168.7.X, or
192.168.198.X. If a conflict occurs, log in to the home WiFi router and change the
LAN IP address on the network configuration page.
Issue 02 (2021-12-30)
NO TE
X ranges from 0 to 255.
Copyright © Huawei Digital Power Technologies Co., Ltd.
10 FAQs
93

Advertisement

Table of Contents
loading

This manual is also suitable for:

Map05a1Mab05b1

Table of Contents