Huawei iSitePower-M User Manual page 49

Hide thumbs Also See for iSitePower-M:
Table of Contents

Advertisement

iSitePower-M (MAP05A1, MAB05B1)
User Manual
Requirements for the Wall and Ground
Installation Dimensions
Reserve sufficient clearance around the product for installation and heat
dissipation.
Figure 6-1 Installation dimensions for one product
Figure 6-2 Installation space for a parallel system or capacity expansion scenario
Issue 02 (2021-12-30)
Concrete walls and brick walls are recommended. Do not use sandwich panel
or wooden walls.
The bearing capacity of the ground must be greater than or equal to 500
2
kg/m
.
Copyright © Huawei Digital Power Technologies Co., Ltd.
6 System Installation
44

Advertisement

Table of Contents
loading

This manual is also suitable for:

Map05a1Mab05b1

Table of Contents