IDS2000 Dual-Row Aisle Containment
V200R002
Installation Guide (Split-type
Skylight, Old-Version Sliding
Door)
Issue
02
Date
2015-06-30
HUAWEI TECHNOLOGIES CO., LTD.

Advertisement

Table of Contents
loading

Summary of Contents for Huawei IDS2000 Dual-Row Aisle Containment

  • Page 1 IDS2000 Dual-Row Aisle Containment V200R002 Installation Guide (Split-type Skylight, Old-Version Sliding Door) Issue Date 2015-06-30 HUAWEI TECHNOLOGIES CO., LTD.
  • Page 2 Notice The purchased products, services and features are stipulated by the contract made between Huawei and the customer. All or part of the products, services and features described in this document may not be within the purchase scope or the usage scope. Unless otherwise specified in the contract, all statements, information, and recommendations in this document are provided "AS IS"...
  • Page 3: About This Document

    NOTICE is used to address practices not related to personal injury. Calls attention to important information, best practices and tips. NOTE is used to address information not related to personal Issue 02 (2015-06-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.
  • Page 4 Issue 02 (2015-06-30) Updated the skylight, sliding door, and cross-pillar aisle containment installation methods Issue 01 (2014-12-20) This issue is the first official release. Issue 02 (2015-06-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.
  • Page 5: Table Of Contents

    4.3 Installing Sealing Components in the Scenarios with a Column ................77 4.3.1 Installing Sealing Plates and Skylight Connective Plates ..................77 4.3.2 Installing Adjustable Skylight Ceilings........................78 Issue 02 (2015-06-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.
  • Page 6 9.1.12 Installing the WCON-22Z Skylight Ceiling Controller ..................146 9.1.13 Installing a WCON-14Z Skylight Controller ....................... 147 9.1.14 Installing the Lighting Control Box ........................148 10 Cable Layout ..........................149 Issue 02 (2015-06-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.
  • Page 7 10.12.26 Connecting a Monitoring Cable to a PEX Air Conditioner ................231 10.12.27 Connecting a Monitoring Cable to a CRV Air Conditioner ................233 10.12.28 Connecting a Monitoring Cable to a DataMate3000 Air Conditioner (Method One) ........234 Issue 02 (2015-06-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.
  • Page 8 A.4 (Optional) Connecting Linkage Cables Between the Gas Extinguishing Controller and ATS ......... 262 A.5 (Optional) Connecting Linkage Cables Between the Fire Extinguishing System and Access Controller....264 A.6 Cable List ................................. 265 Issue 02 (2015-06-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.
  • Page 9: Installation Preparations

    M8, and M12) (M6, M8, and M12) Hand drill (Φ3, Hammer drill (Φ16 Electric screwdriver Heat gun Φ3.7, Φ4, Φ4.5, Φ5, drill bit) Φ6, Φ10, and Φ12 drill bit) Issue 02 (2015-06-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.
  • Page 10 This preceding table only lists the common tools for installation and cable connection. For more information about other required tools, see the documentation for each component. Issue 02 (2015-06-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.
  • Page 11: Installation Process

     Collect and store the fittings from the packages during the installation process. The fittings are required in the subsequent steps. Issue 02 (2015-06-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.
  • Page 12: Installation Scenarios

    Installation Guide (Split-type Skylight, Old-Version Sliding Door) 1 Installation Preparations 1.3 Installation Scenarios Figure 1-2 shows the IDS2000 dual-row aisle containment scenario. Table 1-2 lists the components to be installed. Figure 1-2 Dual-row aisle containment Table 1-2 Installation components for the dual-row aisle containment Component BOM No.
  • Page 13 Rear frame of a 52271152 NetCol5000-A020 Cable ladder 21151136 Control skylight 21500918, 21500944 Rotating skylight 21500915 Flat skylight 21500915, 21500916, 21500917 Skylight connective plate 21500919, 21500921, 21500922 Issue 02 (2015-06-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.
  • Page 14: Installing Cabinets

    Step 1 After the packed IT cabinet arrives onsite, unpack the cabinet. Figure 2-1 shows an unpacked 2000 mm high cabinet, and Figure 2-2 shows an unpacked 2200 mm high cabinet. Do not damage the cabinet exterior. Issue 02 (2015-06-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.
  • Page 15 2 Installing Cabinets Figure 2-1 Unpacked 2000 mm high cabinet Figure 2-2 Unpacked 2200 mm high cabinet Step 2 Remove the screws that secure the cabinet to the pallet. Issue 02 (2015-06-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.
  • Page 16 Step 3 Raise the anchor screws for the 2000 mm high cabinet, which facilitates sliding the cabinet removed from the pallet. Figure 2-5 shows how to raise anchor screws. Skip this step for the 2200 mm high cabinet. Issue 02 (2015-06-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.
  • Page 17: Placing And Securing Cabinets

    Check that the cabinets level with each other using a laser locator. Issue 02 (2015-06-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.
  • Page 18 Use a level to check the floor levelness. Measure the distances by using a measuring tape, and mark lines by using a marker. Check the cabinet levelness by using a level. Issue 02 (2015-06-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.
  • Page 19 Step 2 Mark the array cabinet position in a containment scenario according to the dimensions shown Figure 2-8 and the equipment room space. Figure 2-8 Modular data center layout (left) and position for installing a cabinet (right) (unit: mm) (1) Cabinet door Issue 02 (2015-06-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.
  • Page 20: Installing Adaptive Frames

    Table 2-1 Adaptive frames Adaptive Frame BOM No. Description NetCol5000-C enclosure 21500710 Configured if the number of frame NetCol5000-Cs is odd. The item is used to increase the Issue 02 (2015-06-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.
  • Page 21: Installing Pdu8000 Adaptive Frames

    Figure 2-10 shows the structure of an adaptive frame. Figure 2-10 Structure of an adaptive frame (1) Adaptive bar (2) Adaptive frame main body (3) Leveling base anchor Issue 02 (2015-06-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.
  • Page 22 You can use the leveling feet to adjust the height of the adaptive frame. Procedure Step 1 Install an adaptive frame for an 808 mm wide UPS. Install leveling base anchors on the bottom of the adaptive frame. Issue 02 (2015-06-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.
  • Page 23 Adjust the leveling feet so that the other cabinets are at the same height. Use a 78 mm long parallel plate to combine the adaptive frame with the cabinet. Issue 02 (2015-06-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.
  • Page 24 Figure 2-14 Installing leveling base anchors Adjust the leveling base anchors so that the distance between the bottom and the top of the cabinet is 2000 mm. Issue 02 (2015-06-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.
  • Page 25 Use connecting plates to combine the adaptive frame with the cabinet. Use an 86 mm long connecting plate for the side with adaptive bars, and a 78 mm long connecting plate for the side without adaptive bars. Issue 02 (2015-06-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.
  • Page 26: Installing Netcol5000-C Enclosure Frames

    Step 2 Install connecting kits for the NetCol5000-C enclosure frame to connect the NetCol5000-C and the cabinet to the left and right of the NetCol5000-C enclosure frame. Issue 02 (2015-06-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.
  • Page 27 Step 3 Cover the top panel of the NetCol5000-C enclosure frame on the NetCol5000-C and the cabinet, and secure the top panel to the cabinet using screws. Figure 2-19 Installing the top panel of a NetCol5000-C enclosure frame Issue 02 (2015-06-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.
  • Page 28: Combining Cabinets

    1 in Figure 2-20. Use a measuring tape to measure the cabinet heights at different corners to ensure that the cabinet is level. Issue 02 (2015-06-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.
  • Page 29: Combining Air Conditioners

    2200 mm scenario. The air conditioner cabinet is 2000 mm high. In the 2200 mm scenario, you need to install a top frame on top of the air conditioner before cabinet combination. Issue 02 (2015-06-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.
  • Page 30 This prevents the problem of installing copper pipes after the top frame of the air conditioner is installed. Issue 02 (2015-06-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.
  • Page 31 This section describes how to install a 600 mm wide top frame. Table 2-3 Top frames of air conditioners Type BOM No. 300 mm wide top frame 21500943 600 mm wide top frame 21500942 Issue 02 (2015-06-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.
  • Page 32 2-24. Figure 2-24 Removing the top panel of the air conditioner Secure the top frame to the top of the air conditioner, as shown in Figure 2-25. Issue 02 (2015-06-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.
  • Page 33  Install a top frame for the air conditioner with pipes routed overhead. Remove the top panel of the air conditioner, as shown in Figure 2-24. Issue 02 (2015-06-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.
  • Page 34 Figure 2-28 Installing the top frame of the air conditioner Secure the front side panel of the top frame to the top of the air conditioner, as shown in Figure 2-29. Issue 02 (2015-06-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.
  • Page 35 Figure 2-30 Installing the top panel on the top frame Secure the top frame to the adjacent cabinet using L-type connection plates, as shown in Figure 2-31. Issue 02 (2015-06-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.
  • Page 36: Installing Cabinet Accessories

    For details, see Table 2-4. Table 2-4 Cabinet sealing plate specifications Type BOM No. 600 mm sealing plate 21240454 800 mm sealing plate 21500949 Issue 02 (2015-06-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.
  • Page 37: Removing Rack Power Distribution Unit

    PDU2000 industrial connectors, as shown in Figure 2-33. If the PDU2000 does not have an industrial connector, take out its cables and place them on the top of the cabinet. Issue 02 (2015-06-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.
  • Page 38 Step 2 Place the PDU2000 industrial connectors and cables on the top of the cabinet and reinstall the top cover, as shown in Figure 2-34. Figure 2-34 Laying out the PDU2000 industrial connectors and cables ----End Issue 02 (2015-06-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.
  • Page 39: Installation Scenarios In Dual Row Aisle Containment

    Skylights are classified into control skylights, 300 mm wide flat skylights, 600 mm wide flat skylights, and rotating skylights, as shown in Figure 3-2, Figure 3-4, Figure 3-3, and Figure 3-5. Table 3-1 describes the rules for laying out the skylights. Issue 02 (2015-06-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.
  • Page 40 (2) Skylight connective plates (3) Magnetic lock fastener (4) Flat or rotating skylight The skylight mounting brackets and magnetic lock fastener are packed with skylight connective plates. Issue 02 (2015-06-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.
  • Page 41 The skylight mounting brackets and magnetic lock fastener are packed with skylight connective plates. Table 3-1 Layout rules Type Specifications BOM No. Layout Sequence (Width) Issue 02 (2015-06-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.
  • Page 42 Connects a skylight plate and a cabinet 600 mm 21500919 800 mm 21500921 PVC pipe Total length: 1200 Length measuring fixture, packed with control skylights Notch distance: 1128 mm Issue 02 (2015-06-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.
  • Page 43 Secure the skylight connective plate to the common cabinet: secure skylight connective plates to the top of cabinets using a socket wrench and M12 bolts, as shown in Figure 3-7. Issue 02 (2015-06-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.
  • Page 44 If certain air conditioners or UPS cabinets have no M12 tapped holes at the top, secure the skylight connective plate to the top of the cabinet using a socket wrench and M8 bolts, as shown in Figure 3-8. Issue 02 (2015-06-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.
  • Page 45 Figure 3-8 Installing a skylight connective plate at the top of air conditioner or UPS cabinets Secure the adjacent skylight connective plates using M6 screws and nuts, as shown in Figure 3-9. Issue 02 (2015-06-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.
  • Page 46 Figure 3-11. Secure the skylight to the skylight connective plates using M4 screws, as shown in Figure 3-11. Issue 02 (2015-06-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.
  • Page 47 Step 6 Secure the 300 mm wide flat skylights using M4× 12 screws and nuts. Figure 3-12 Secure the 300 mm wide flat skylights Step 7 Install rotating skylights and 600 mm wide flat skylights. Issue 02 (2015-06-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.
  • Page 48 Install the magnetic lock fasteners used for flat skylights on the skylight connective plates on one side of the aisle using M4 screws, as shown in Figure 3-14. Figure 3-13 Installing magnetic lock fasteners for rotating skylights Issue 02 (2015-06-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.
  • Page 49 3-16.  Be careful not to be hurt by sharp edges of skylight barrier strips.  Protect your hands from being clamped by skylights when mounting skylights. Issue 02 (2015-06-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.
  • Page 50 The barrier strip for the rotating skylight can make it rotate in only one direction. Install all the barrier strips for the rotating skylights on the same side, as shown in Figure 3-17. Figure 3-16 Installing skylights Figure 3-17 Barrier strip direction Issue 02 (2015-06-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.
  • Page 51 Step 8 Using M4x12 cross recessed pan head screw assemblies to install the barrier strips for the control skylight according to the location of barrier strips for the other skylights, as shown in Figure 3-20. Issue 02 (2015-06-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.
  • Page 52 Do not use a sharp metal pole to open a skylight. Otherwise: − The pole might scratch the coating surface of the skylight. − It might break the reinforced glass. Issue 02 (2015-06-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.
  • Page 53: Installing Cabinet Sealing Plates

    Figure 3-21 Assembling the front, rear, and side sealing plates Step 2 Secure the assembled frames to the bottom of the front cabinets by using M6x16 self-tapping screws. Issue 02 (2015-06-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.
  • Page 54: Installing End Doors

    2000 mm (tolerance: ± 3 mm) between the cabinet top and the upper surface of the ESD floor. If 2200 mm high cabinets are used, check that the Issue 02 (2015-06-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.
  • Page 55: Installing A Sliding Door

    After leveling cabinets, measure the height from the ESD floor. 3.4.1 Installing a Sliding Door Context Figure 3-23 shows the structure of a sliding door. Figure 3-23 Structure Issue 02 (2015-06-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.
  • Page 56 R on the right cabinet. Then secure the mounting brackets by installing screws in back of the mounting brackets, as shown in Figure 3-24 Figure 3-25. Issue 02 (2015-06-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.
  • Page 57 L on the left cabinet, and the mounting bracket marked R on the right cabinet. Then secure the mounting brackets by installing screws in back of the mounting brackets, as shown in Figure 3-26. Issue 02 (2015-06-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.
  • Page 58 Step 2 Secure an upper guide rail to the left and right mounting ears of the sliding door using M6 screws, as shown in Figure 3-27. Figure 3-27 Installing an upper guide rail Step 3 Install a sliding door top frame. Issue 02 (2015-06-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.
  • Page 59 Install lower shimmy dampers for a 2000 mm high cabinet. Face the aisle, and install the lower shimmy damper marked L on the left cabinet, and the lower shimmy damper Issue 02 (2015-06-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.
  • Page 60 Adjust the hanging wheel of the sliding door to ensure that the inner side of the hanging wheel and the surface of the stay bolt align with each other, as shown in Figure 3-32. Issue 02 (2015-06-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.
  • Page 61 3 Installation Scenarios in Dual Row Aisle Containment Figure 3-32 Adjusting a hanging wheel Push the sliding door into the upper guide rail and the lower stopper, as shown in Figure 3-33. Issue 02 (2015-06-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.
  • Page 62 The dimensions shown in Figure 3-34 is for reference.  Huawei recommends installing two door panels symmetrically beside the axis of the doorhead, which contributes to installation elegance. Issue 02 (2015-06-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.
  • Page 63 Upper gaps are The right is higher Rotate the internal wider than lower than the left at the hanging wheel of the Issue 02 (2015-06-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.
  • Page 64 Issue 02 (2015-06-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.
  • Page 65 Slide the door panel until the door handle is exposed outside the cabinet door, as shown in Figure 3-37, to ensure smooth door opening and closing from the interior. Figure 3-36 Installing the positioning kits at the ends Issue 02 (2015-06-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.
  • Page 66 Figure 3-37 Positions of a door panel and front cabinet door (1) Lock (2) Cabinet Step 10 Install barrier chips on the guide rail, as shown in Figure 3-38. Secure barrier chips using the delivered screws. Issue 02 (2015-06-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.
  • Page 67 IDS2000 Dual-Row Aisle Containment Installation Guide (Split-type Skylight, Old-Version Sliding Door) 3 Installation Scenarios in Dual Row Aisle Containment Figure 3-38 Installing barrier chips on a guide rail ----End Issue 02 (2015-06-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.
  • Page 68: Installing A Double Revolving Door (Compatible With Access Control Components)

    The double revolving door can be installed for:  600 mm or 800 mm wide cabinets  Enclosure frames  2000 mm or 2200 mm high cabinets Issue 02 (2015-06-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.
  • Page 69 Step 2 Assemble a door frame by connecting the two door posts, upper frame mounting kit of a double revolving door, and the auxiliary bar using M6 hexagon screw assemblies, as shown in Figure 3-40. Issue 02 (2015-06-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.
  • Page 70 2 m high cabinet, tighten screws into holes shown in 2 in Figure 3-41. If a door post is secured to a 2.2 m high cabinet, tighten screws into holes shown in 1 in Figure 3-41. Issue 02 (2015-06-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.
  • Page 71 Check whether the doorhead is level by using a spirit level. Adjust the doorhead if the levelness deviation exceeds 0.5° . Procedure Step 1 Observe the levelness of the doorhead. Adjust the anchor bolts of cabinets if it is not level. Issue 02 (2015-06-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.
  • Page 72 Step 1 Lift a door panel, and secure the door panel to a post using the three hinges. Perform the same operations to secure the other door panel. Issue 02 (2015-06-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.
  • Page 73 Door mismatch The left and right cabinets For details about the adjusting onto which the door header is method, see Step hung are not on the same Issue 02 (2015-06-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.
  • Page 74 Figure 3-46. Pull the upper end of the posts outward if a corner of a door panel tilts upward. Issue 02 (2015-06-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.
  • Page 75 Figure 3-46. After adjustment, verify that all loosened screws are tightened. Figure 3-46 Mismatching doors ----End Issue 02 (2015-06-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.
  • Page 76 Ensure that the end with springs is secured to the end that is to be connected to the door post, as shown in Figure 3-49. Issue 02 (2015-06-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.
  • Page 77 If the arm does not fit easily, strike with a rubber mallet to install the closer arm in position. Figure 3-50 Adjusting the position of the door closer arm (1) Door closer arm (2) Door panel (3) Guide rail Issue 02 (2015-06-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.
  • Page 78 If the lever does not fit firmly into the guide rail, adjust the captive screws using the solid wrench delivered with the closer to fasten the lever. Issue 02 (2015-06-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.
  • Page 79 Use a flat-head screwdriver to adjust the tuning screw for openness range a by tightening it slightly along the "+" direction, until the arm can swiftly move back to the original position. Issue 02 (2015-06-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.
  • Page 80 Step 1 Snap side panels into the door posts, push them down to the buckles, and ensure that they fit firmly into the bottom of the posts. Issue 02 (2015-06-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.
  • Page 81 3 Installation Scenarios in Dual Row Aisle Containment Figure 3-55 Snap side panels Step 2 Remove the auxiliary bar from the bottom of the door frame. ----End Issue 02 (2015-06-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.
  • Page 82: Installation Scenarios With Pillars

    IDS2000 Dual-Row Aisle Containment Installation Guide (Split-type Skylight, Old-Version Sliding Door) 4 Installation Scenarios with Pillars Installation Scenarios with Pillars 4.1 Installation Scenarios Context Table 4-1 Installation scenarios Issue 02 (2015-06-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.
  • Page 83 IDS2000 Dual-Row Aisle Containment Installation Guide (Split-type Skylight, Old-Version Sliding Door) 4 Installation Scenarios with Pillars Issue 02 (2015-06-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.
  • Page 84: Installation Flowchart

    IDS2000 Dual-Row Aisle Containment Installation Guide (Split-type Skylight, Old-Version Sliding Door) 4 Installation Scenarios with Pillars 4.2 Installation Flowchart Context Figure 4-1 Installation flowchart Issue 02 (2015-06-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.
  • Page 85: Installing Sealing Components In The Scenarios With A Column

    The flanges on the sealing kit are against the pillar. Step 2 Secure the skylight connective plate to the sealing plate or cabinet using bolts. Issue 02 (2015-06-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.
  • Page 86: Installing Adjustable Skylight Ceilings

    Holders for adjustable skylights include skylight connective plate holders, fixed holders, and moveable holders, as shown in Figure 4-3. The BOM number of an adjustable skylight is 21500937. Issue 02 (2015-06-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.
  • Page 87 (5) Skylight connective plate (on the sealing kit) Procedure Step 1 Secure two skylight connective plate holders to the skylight connective plate using bolts. Figure 4-4 Installing skylight connective plate holders Issue 02 (2015-06-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.
  • Page 88 Step 1 Install a movable bracket on the fixed bracket and skylight side panel bracket, and tighten screws into holes in the middle and ends of the movable bracket, as shown in Figure 4-6. Issue 02 (2015-06-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.
  • Page 89  The rotating skylight can rotate downwards from the side close to the adjustable skylight. Figure 4-7 Installing a barrier strip Issue 02 (2015-06-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.
  • Page 90: Securing Beams To Holder Sides

    1 in Figure 4-9. Then stick the PC plate to the sealing rubber strip, as shown in step 2. Issue 02 (2015-06-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.
  • Page 91 Step 3 Attach the buckle to the PC plate and push it into the buckle slot. Then seal the extra adjustment holes in the movable holder and fixed holder by using sealing rubber strips. Figure 4-10 Attaching a buckle and sealing rubber strips Issue 02 (2015-06-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.
  • Page 92: Installing Side Pressure Plates

    Step 3 Cut the PC plate to an appropriate size and insert it into the upper and lower conduits of the pressure plate. Figure 4-11 Installing a PC plate Step 4 Secure another pressure plate to the other end of the PC plate by using bolts. Issue 02 (2015-06-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.
  • Page 93: Installing A Cable Trough Support Plate

    If the column is between the aisle and an empty cabinet space, you can choose to install one or two cable trough support plates based on the empty cabinet space the column occupies. Issue 02 (2015-06-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.
  • Page 94 Step 2 Install cable troughs by following the instructions in 6 Installing Cable Troughs. Place cable troughs on the cable trough support plate in the empty cabinet space. ----End Issue 02 (2015-06-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.
  • Page 95: Installing Cable Trays

    Step 1 Remove the two screws that secure the skylight connective plate to the cabinet and secure a fixing plate to the skylight side panel on the top of the cabinet, as shown in Figure 5-2. Issue 02 (2015-06-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.
  • Page 96 Step 3 Place the cable ladder on the bases and secure the cable ladder to the bases using conversion brackets and M8 x 20 bolt assemblies, as shown in Figure 5-4. Issue 02 (2015-06-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.
  • Page 97 1 in Figure 5-6. Connect bases to the M6 ground screws in the cabinets using ground cables, as shown by 2 in Figure 5-6. Issue 02 (2015-06-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.
  • Page 98 Figure 5-7. Figure 5-6 Ground points of the cable ladder and base Figure 5-7 Ground points of the cabinet ----End Issue 02 (2015-06-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.
  • Page 99: Installing 190 Mm High Cable Trays (For 2.2 M High Cabinets)

    Step 1 Install a fixing plate for a cable tray base. Figure 5-8 Installing a fixing plate Step 2 Disassemble the base. Base A is not needed. Figure 5-9 Base (1) Base A (2) Base B Issue 02 (2015-06-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.
  • Page 100: Installing Cable Trays In Scenarios With Columns

    Installing 390 mm High Cable Trays (for 2 m and 2.2 m High Cabinets) 5.2 Installing 190 mm High Cable Trays (for 2.2 m High Cabinets). Select cable trays based on the cabinet height. ----End Issue 02 (2015-06-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.
  • Page 101: Installing Cable Troughs

    Cold aisle containment: First install a cable trough close to the front door of the cabinet. When installing a cable trough close to the rear door, move the cables that have been laid Issue 02 (2015-06-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.
  • Page 102 Step 1 Keep a bracket of a cable trough at the same level as a cabinet roof, and insert the clasps of the bracket into the fifth row of holes counting from the front door to the rear door, as shown Figure 6-3. Issue 02 (2015-06-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.
  • Page 103 M5 x 10 tapping screw to the interior of two panels using a long-handled Phillips screwdriver, as shown in Figure 6-5. Issue 02 (2015-06-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.
  • Page 104 Figure 6-7. (By default, insert the clasps into the two square holes in the middle. In actual conditions, you can select square holes as required.) Issue 02 (2015-06-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.
  • Page 105 Step 7 Repeat the preceding steps to install cable troughs 117 mm (a distance of five square holes) away from the preceding troughs, as shown in Figure 6-9. Issue 02 (2015-06-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.
  • Page 106: Installing 300 Mm Wide Cable Troughs

    300 mm wide cable trough. The BOM number of 300 mm wide cable trough is 21500560. Figure 6-10 300 mm wide cable trough (1) Partition (2) Bracket (3) Pallet (4) Cable bridge Issue 02 (2015-06-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.
  • Page 107: Installing 800 Mm Wide Cable Troughs

    The BOM number of 800 mm Wide Cable Trough is 21500702. Procedure Step 1 For details about how to install 800 mm wide cable troughs, see Installing 600 mm Wide Cable Troughs. Issue 02 (2015-06-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.
  • Page 108: Installing Cable Troughs On The Top Of In Row Air Conditioners Inside The Modular Data Center

    Figure 6-12 uses a hot aisle as an example. Issue 02 (2015-06-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.
  • Page 109 Installation Guide (Split-type Skylight, Old-Version Sliding Door) 6 Installing Cable Troughs Figure 6-12 Pressing the end panels into the hooks During the installation, the parallel wrench is vertical. ----End Issue 02 (2015-06-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.
  • Page 110: Installing The Access Control System

    Figure 7-1 Layout of access control components (1) Audible and visual alarm (2) Card reader (3) Emergency door release button (4) Lighting switch (5) Door exit button (6) Dual-door magnetic lock Issue 02 (2015-06-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.
  • Page 111: Installing Magnetic Locks And Magnets

    Remove the fixing plate from the magnetic lock using the hex key delivered with the magnetic lock. The four hex socket screws should be removed in this step. Issue 02 (2015-06-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.
  • Page 112 Figure 7-4 Securing the fixing plate to a magnetic lock base Connect the magnetic lock cable to the skylight sealing kit, and secure the magnetic lock to the fixing plate using a hex key. Issue 02 (2015-06-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.
  • Page 113 Install the magnetic lock with its base on the doorhead using three M4 screw assemblies. Figure 7-6 Installing the bottom plate of a magnetic lock base Step 2 Install the top plate of a magnetic lock base. Issue 02 (2015-06-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.
  • Page 114 In this step, use a claw hammer to drive the magnet components into the magnets. Figure 7-8 Assembling a magnet Secure magnet bases to the top of the double door panels. Issue 02 (2015-06-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.
  • Page 115 Secure assembled magnets to the bases using delivered hex socket screws. Figure 7-10 Installing a magnet Step 4 Adjust magnets. If a magnet does not work properly after power-on, check as follows: Issue 02 (2015-06-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.
  • Page 116 If the magnet is not level, use a spacer shown in Figure 7-12 to adjust the magnet levelness. Figure 7-11 Adjusting the gap between a magnetic lock and a magnet Figure 7-12 Spacer Issue 02 (2015-06-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.
  • Page 117: Installing A Card Reader

    Step 2 Remove the card reader mounting bracket from the door post. Remove the side panel of the door post before installing the card reader. Reinstall the side panel after the card reader is installed and connected. Issue 02 (2015-06-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.
  • Page 118 M3 screws, as shown in Figure 7-15. This step requires a small screw driver. Figure 7-15 Installing a card reader Step 4 Secure the front cover to the card reader. Issue 02 (2015-06-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.
  • Page 119 Step 5 Secure the card reader mounting bracket to the post using two M4 screws, as shown in Figure 7-17. Figure 7-17 Installing the card reader mounting bracket ----End Issue 02 (2015-06-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.
  • Page 120: Installing An Access Control Box

    Step 1 Unlock the access control box with the delivered key. Figure 7-18 Unlocking an access control box Step 2 Secure the access control box to the access control component mounting plate using four M4 screws. Issue 02 (2015-06-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.
  • Page 121  Select an appropriate installation position in the network cabling cabinet for the access control box.  Ensure that the two mounting brackets level with each other. Issue 02 (2015-06-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.
  • Page 122 Step 4 Install the access control component mounting plate onto the mounting brackets and tighten the two M6 panel screws on both sides, as shown in Figure 7-21. Figure 7-21 Securing an access control component mounting plate ----End Issue 02 (2015-06-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.
  • Page 123: Installing Switches

    Step 1 Remove the four screws from the real panel of the door and take away the panel. Figure 7-22 Removing the panel Step 2 Remove the baffle from the panel. Issue 02 (2015-06-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.
  • Page 124 Connect cables to the switch body before securing it to the base. For details, see the 10.12.20 Connecting a Monitoring Cable to an Access Controller in a Modular Data Center. Issue 02 (2015-06-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.
  • Page 125 Insert screws into any two diagonal holes out of the four holes on the switch body, and tighten the screws. Step 5 Clamp the switch cover to the switch body. Figure 7-26 Installing the switch cover Step 6 Reinstall the panel removed in Step Issue 02 (2015-06-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.
  • Page 126 IDS2000 Dual-Row Aisle Containment Installation Guide (Split-type Skylight, Old-Version Sliding Door) 7 Installing the Access Control System Figure 7-27 Reinstalling the panel ----End Issue 02 (2015-06-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.
  • Page 127: Optional) Installing The Lighting System

    The aisle lights are installed parallel to the aisle. The aisle-side LED lights are in series, and installed on the skylight connective plates, as shown in Figure 8-1. The BOM number of the aisle LED light is 52220134. Issue 02 (2015-06-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.
  • Page 128 An LED light has a male connector and a female connector in pairs, as shown in Figure 8-2. When installing LED lights, ensure that all the male connectors face the same direction (same for the female connectors) for serial connection. Issue 02 (2015-06-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.
  • Page 129 The M3 screws are factory-installed on the skylight connective plate. Remove the screws from the skylight connective plate before installing the LED light holder.  Ensure that each LED light is secured by two holders. Issue 02 (2015-06-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.
  • Page 130 Figure 8-3 Installing an LED light holder Step 2 Install an LED light to the light holder, as shown in Figure 8-4. Figure 8-4 Installing an LED light Issue 02 (2015-06-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.
  • Page 131: Installing An In-Cabinet Light

    Step 1 Install an in-cabinet light. Secure an in-cabinet light mounting bracket to the middle of the front beam using M5 tapping screws, as shown in Figure 8-6. Issue 02 (2015-06-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.
  • Page 132 Secure the in-cabinet light holders to the mounting bracket using M4 countersunk screws, as shown in Figure 8-7. Figure 8-7 Installing in-cabinet light holders Clamp an in-cabinet light to the holders, as shown in Figure 8-8. Issue 02 (2015-06-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.
  • Page 133 Secure the in-cabinet light switch to the mounting bracket using M4x20 screws, as shown in Figure 8-10. Bind the power cable to the nearby round holes using cable ties. Figure 8-10 Installing an in-cabinet light switch Issue 02 (2015-06-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.
  • Page 134 If interference occurs, insert screws into the two round holes shown by (2) in Figure 8-11. Figure 8-11 Holes for securing the mounting bracket ----End Issue 02 (2015-06-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.
  • Page 135: Installing Auxiliary Devices

    Install the server by using the special floating nuts packaged with the RH2288. Figure 9-1 Installing a floating nut Step 2 Install guide rails, as shown in Figure 9-2. Issue 02 (2015-06-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.
  • Page 136 9-2. Step 3 Place the RH2288 on the guide rails and push it in to the rack. As shown in Figure 9-3. Figure 9-3 Installing the RH2288 Issue 02 (2015-06-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.
  • Page 137 Step 5 Install power cables between the RH2288 and the PDU2000. RH2288 requires two power supplies. Connect both power cables to the PDU2000. Figure 9-5 Installing power cables for the RH2288 ----End Issue 02 (2015-06-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.
  • Page 138: Installing A Lan Switch

    LAN switch onsite. Insert the power modules into the power slots of the 24-port LAN switch, and tighten the captive screws on the power supply panel, as shown in Figure 9-7. Issue 02 (2015-06-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.
  • Page 139: Installing A Ccu Collector

    Step 4 Place the CCU collector in the network cabling cabinet. Secure the CCU collector in the network cabling cabinet by clockwise tightening the M6 screws on the left and right mounting ears, as shown by (2) in Figure 9-8. Issue 02 (2015-06-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.
  • Page 140 Remove the filler panel using a Phillips screwdriver, insert the EEU environment expansion card into the lower slot, and then close and lock the handle. Issue 02 (2015-06-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.
  • Page 141 (2) UEU serial port expansion card Step 6 Install a ground cable for the CCU collector, as shown in Figure 9-10. Figure 9-10 Installing a ground cable for the CCU collector Issue 02 (2015-06-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.
  • Page 142: Installing An Ecc Collector

    Step 3 Place the ECC collector in the network cabling cabinet. Secure the ECC collector in the network cabling cabinet by clockwise tightening the M6 screws on the left and right mounting ears, as shown by 2 in Figure 9-12. Issue 02 (2015-06-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.
  • Page 143: Installing An Nvr

    9.1.4 Installing an ECC Collector. ----End 9.1.6 Installing and Connecting Monitoring Components Install monitoring components to specified holes on the control skylight panel, as shown in Figure 9-13. Issue 02 (2015-06-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.
  • Page 144 9.1.8 Installing a Smoke 10.12.14 Connecting a Detector. Monitoring Cable to the SDLH-94R Dry Contact-Type Smoke Sensor. Camera 9.1.7 Installing a Camera. 10.12.11 Connecting a Monitoring Cable to a Camera. Issue 02 (2015-06-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.
  • Page 145: Installing A Camera

    Prior to installing the camera, properly install related cables to avoid removing it from time to time. Step 3 Use the hexagon screwdriver delivered with the camera to remove the explosion-proof screws, and take down the dome cover, as shown in Figure 9-15. Issue 02 (2015-06-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.
  • Page 146 For details about how to install the camera and connect cables to it, refer to your delivered documents. Step 5 Reinstall the dome cover and tighten the screws, as shown in Figure 9-17. Issue 02 (2015-06-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.
  • Page 147: Installing A Smoke Detector

    Prior to installing the smoke detector, properly connect the detector cables to avoid unnecessary removal. Procedure Step 1 Secure the smoke detector base to the appropriate hole in the control skylight using M3x10 screws, as shown in Figure 9-18. Issue 02 (2015-06-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.
  • Page 148: Installing A Ws302M2A-5 Ambient Temperature And Humidity Sensor

    The object to carry the ambient temperature and humidity sensor has been installed.  An ambient temperature and humidity sensor and tools for installing it have been prepared. Issue 02 (2015-06-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.
  • Page 149 Step 2 Press down the strip on the ambient temperature and humidity sensor. Align the strip with the hole in the sensor base, and then secure the ambient temperature and humidity sensor to the base, as shown in Figure 9-21. Issue 02 (2015-06-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.
  • Page 150: Installing An Infrared Sensor

    Prior to installing the infrared sensor, properly install related cables to avoid removing it from time to time. Procedure Step 1 Secure the infrared sensor base to the control skylight by using M3x10 bolts, as shown in Figure 9-22. Issue 02 (2015-06-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.
  • Page 151: Installing A Wlds900 Water Sensor

    If air is supplied from under the floor, a cofferdam has been installed around the air conditioners.  If air is supplied horizontally, the modular data center has been completely installed. Issue 02 (2015-06-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.
  • Page 152 Choose a proper installation place for the water detection cable based on site requirements. Procedure Step 1 Figure 9-25 shows how to connect the water detection cable to the conversion cable. Issue 02 (2015-06-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.
  • Page 153 Step 5 Drill holes into the floor with the same dimensions as the expansion bolts for the fastener. Use the expansion bolts and screws to secure the fastener to the floor, as shown in Figure 9-27. Issue 02 (2015-06-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.
  • Page 154: Installing The Wcon-22Z Skylight Ceiling Controller

    9.1.12 Installing the WCON-22Z Skylight Ceiling Controller Prerequisites This section describes how to install the skylight ceiling controller on the outer surface of the controlled skylight ceiling. Issue 02 (2015-06-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.
  • Page 155: Installing A Wcon-14Z Skylight Controller

    Step 4 Place the skylight controller in the network cabling cabinet. Secure the skylight controller in the network cabling cabinet by clockwise tightening the M6 screws on the left and right mounting ears, as shown by 2 in Figure 9-30. Issue 02 (2015-06-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.
  • Page 156: Installing The Lighting Control Box

    Perform the same steps to install the lighting control box as installing the skylight ceiling controller. For details, see 9.1.13 Installing a WCON-14Z Skylight Controller. Issue 02 (2015-06-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.
  • Page 157: Cable Layout

    10 Cable Layout Cable Layout 10.1 Cable Routing for the Dual-row Aisle Containment Scenario When routing cables, leave at least 100 mm space between power cables and signal cables. Issue 02 (2015-06-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.
  • Page 158 Installation Guide (Split-type Skylight, Old-Version Sliding Door) 10 Cable Layout Figure 10-1 Routing power cables and signal cables (1) Optical fiber (2) Network cable (signal cable) (3) Power cable Issue 02 (2015-06-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.
  • Page 159 2N scenario. In N+1 and N scenarios, route strong-current cables to cabinets on the other end of the aisle from the cable tray on the top of the PDU8000. Issue 02 (2015-06-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.
  • Page 160: Installation Positions And Cable Routing For Monitoring Components

    Table 10-1 Devices accessing the monitoring components Device Access Device Camera Switch in the cabling cabinet Smoke detector Skylight controller in the cabling cabinet Switch in the cabling cabinet Issue 02 (2015-06-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.
  • Page 161 Lighting controller cabinet in the cabling cabinet Figure 10-4 shows the cabling routes for the door open button, illuminating switch, emergency door release button, card reader, and audible and visual alarm. Issue 02 (2015-06-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.
  • Page 162 Connect the smoke detector and the infrared sensor to corresponding devices through a cable terminal distributed to the site, as shown by 1 in Figure 10-5. Issue 02 (2015-06-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.
  • Page 163: Connecting Cables To The Double Door Electromagnetic Locks And Emergency Door Release Button

    A delivered with the cabinet, as shown in Figure 10-6. Issue 02 (2015-06-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.
  • Page 164 After connecting cables to wire harness B, place wire harness B near the emergency door release button without securing it. Route four-core cable B out of the aisle and finally to the access control controller in the cabling cabinet according to Figure 10-7. Issue 02 (2015-06-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.
  • Page 165 (3) Four-core cable A (4) Wire harness B (5) Four-core cable B (6) Rear of the emergency door release button (A) Door access controller in the cabling cabinet Issue 02 (2015-06-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.
  • Page 166: Cable Routing For The Cabinet Lighting

    Figure 10-9 Cable connections for the lighting splitter (A) Connecting to the lighting controller cabinet in the cabling cabinet  Cable connections for the cabinet LED lamp: Issue 02 (2015-06-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.
  • Page 167: Cable Routing For The Aisle Lighting System

    (A) Connecting to the cabinet LED lamp (B) Connecting to the splitter 10.5 Cable Routing for the Aisle Lighting System Figure 10-11 shows the cable routes for the aisle lighting system. Issue 02 (2015-06-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.
  • Page 168 Connect the cable to the lighting control box in the network cabling cabinet, as shown in Figure 10-12 Figure 10-13. In this example, a male connector is cut off. Issue 02 (2015-06-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.
  • Page 169 Figure 10-13 Clamping cables using a multi-wire terminal The cable outlet of the aisle lights is located on the outermost skylight connective plate, as shown in Figure 10-14. Issue 02 (2015-06-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.
  • Page 170: Cable Routing For Skylight Magnetic Locks

    Figure 10-15. Figure 10-15 Routing cables for magnetic locks (1) Connecting to the skylight controller in the network cabling cabinet Issue 02 (2015-06-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.
  • Page 171: Routing Power Cables

    (6) Power cable for the air conditioner indoor unit (7) Equipotential bonding cable (8) Connecting to the floor for the cabinet and battery ground bar or ground cabinet busbar Issue 02 (2015-06-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.
  • Page 172 (6) Air conditioner (7) PDU8000 Special purpose cabinet (8) Server cabinet (SC)(380 V dual power supplies, 480 V single power supply) (9) Network cabling cabinet (10) Cold aisle containment Issue 02 (2015-06-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.
  • Page 173: Grounding Cabinets

    480 V single power supply) (7) Server cabinet (8) Air conditioner (9) Network cabling cabinet 10.8 Grounding Cabinets Figure 10-19 shows the ground points. Connect ground cables between cabinets as follows: Issue 02 (2015-06-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.
  • Page 174: Routing Signal Cables

    Figure 10-19 Cabinet ground points (1) Cabinet ground bar (optional) (2) Cabinet ground point 10.9 Routing Signal Cables NetEco Scenario Figure 10-20 shows signal cable routes in the NetEco scenario. Issue 02 (2015-06-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.
  • Page 175: Installing Cables For The Power Supply And Distribution System

    Figure 10-21 Signal cable routes in the NetEsy scenario 10.10 Installing Cables for the Power Supply and Distribution System 10.10.1 Connecting Cables to Battery Cabinets The IDS2000-M has 16 battery cabinet configurations. Issue 02 (2015-06-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.
  • Page 176 Figure 10-23. To prevent misshaping battery terminals, do not connect the cable in the way shown in Figure 10-24. Issue 02 (2015-06-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.
  • Page 177 Figure 10-25 shows the cabling between the air circuit breakers and the busbar. Issue 02 (2015-06-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.
  • Page 178 Battery Accessory, SD-480 1 PCS V 65 Ah/12 V-PX-25 (ET), Cables for battery group SHOTO 6-GFM-65 embedded in battery cabinet of IDC (25 mm ), IDC special Issue 02 (2015-06-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.
  • Page 179 Battery tray for 4 batteries 10 PCS Circuit breaker Circuit breaker, 1 PCS Pyromagnetic Breaker, 380 V AC/500 V DC, 125 A, 4P, 36 kA, 102 (W)*70 (D)*130 Issue 02 (2015-06-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.
  • Page 180 16 kW < actual total power ≤ 24 kW; backup time: 15 minutes  24 kW < actual total power ≤ 32 kW; backup time: 15 minutes  The following table describes battery cabinet configuration. Issue 02 (2015-06-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.
  • Page 181 V 40 Ah/12 V-PX-25 (ET), Cables for battery group SHOTO 6-GFM-40 embedded in battery cabinet of IDC (25 mm ), IDC special Figure 10-28 Conceptual diagram of battery cable connections Issue 02 (2015-06-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.
  • Page 182 Battery Accessory, SD-480 1 PCS V 40 Ah/12 V-PX-25 (ET), Cables for battery group SHOTO 6-GFM-40 embedded in battery cabinet of IDC (25 mm ), IDC special Issue 02 (2015-06-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.
  • Page 183 Battery cable Battery Accessory, SD-480 1 PCS V 40 Ah/12 V-PX-25 (ET), Cables for battery group SHOTO 6-GFM-40 embedded in battery cabinet of IDC (25 mm ), IDC Issue 02 (2015-06-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.
  • Page 184 Battery tray for 4 batteries 8 PCS Circuit breaker Circuit breaker, Module 1 PCS Case Circuit Breaker, 380/415 V AC, 160 A, 3P, 36 kA, C, 102 (W)*76.2 (D)*130 (H) Issue 02 (2015-06-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.
  • Page 185 Battery Rechargeable Battery 480 A string of 40 batteries V-100 Ah Battery Battery tray Battery tray for 4 batteries 10 PCS Circuit breaker Circuit breaker, 1 PCS Issue 02 (2015-06-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.
  • Page 186 48 kW, and the backup time is 30 minutes. The following table describes battery cabinet configuration. Table 10-9 Battery cabinet configuration 8 Component Configuration Configuration Number Rechargeable Battery 480 Battery A string of 40 batteries Issue 02 (2015-06-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.
  • Page 187 Configuration 9 applies to the scenario where the actual total power is greater than 8 kW but no greater than 12 kW, and the backup time is 30 minutes. The following table describes battery cabinet configuration. Issue 02 (2015-06-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.
  • Page 188 Battery Accessory, SD-480 1 PCS V 26 Ah/12 V-PX-25 (ET), Cables for battery group SHOTO 6-GFM-26 embedded in battery cabinet of IDC (25 mm ), IDC special Issue 02 (2015-06-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.
  • Page 189 A string of 32 batteries V-65 Ah Battery Battery tray Battery tray for 4 batteries 8 PCS Circuit breaker Circuit breaker, Module 1 PCS Case Circuit Breaker, Issue 02 (2015-06-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.
  • Page 190 36 kW < actual total power ≤ 72 kW; backup time: 15 minutes  48 kW < actual total power ≤ 72 kW; backup time: 15 minutes  The following table describes battery cabinet configuration. Issue 02 (2015-06-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.
  • Page 191 (H), Top out, Cables for battery group SHOTO 6-GFM-100 embedded in battery cabinet of IDC (50 ), IDC special Figure 10-36 Conceptual diagram of battery cable connections Issue 02 (2015-06-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.
  • Page 192 Battery Cabinet Installation, 600 mm (W)*1100 mm (D)*2000 mm (H), Top out, Cables for battery group SHOTO 6-GFM-26 embedded in battery cabinet of IDC (25 mm ), IDC special Issue 02 (2015-06-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.
  • Page 193 V 65 Ah/12 V-PX-25 (ET), Battery Cabinet Installation, 600 mm (W)*1100 mm (D)*2000 mm (H), Top out, Cables for battery group SHOTO 6-GFM-65 embedded in battery cabinet Issue 02 (2015-06-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.
  • Page 194 V-100 Ah Battery Battery tray Battery tray for 4 batteries 6 PCS Circuit breaker Circuit breaker, 690 V AC, 1 PCS 250 A, 3P, 36 kA/415 V AC, 105 Issue 02 (2015-06-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.
  • Page 195 30 minutes. The following table describes battery cabinet configuration. Table 10-16 Battery cabinet configuration 15 Component Configuration Configuration Number Rechargeable Battery 288 Battery A string of 24 batteries Issue 02 (2015-06-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.
  • Page 196 (D)*2000 mm (H), Top out, Cables for battery group SHOTO 6-GFM-40 embedded in battery cabinet of IDC (25 mm ), IDC special Figure 10-40 Conceptual diagram of battery cable connections Issue 02 (2015-06-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.
  • Page 197 (H), Top out, Cables for battery group SHOTO 6-GFM-150 embedded in battery cabinet of IDC (35 ), IDC special Figure 10-41 Conceptual diagram of battery cable connections Issue 02 (2015-06-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.
  • Page 198: Connecting Cables To The Power Supply And Distribution System

    Table 10-19 Reference documents for power supply and distribution devices Category Equipment Installation Document PDU8000 PDU8000 Compositive Quick installation guide Cabinet (CC) (delivered with equipment) PDU8000 Special Purpose Quick installation guide Issue 02 (2015-06-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.
  • Page 199: Connecting Cables To The Temperature Control System

    User Manual (delivered with NetCol5000-C025s equipment) Air-cooled upflow using Emerson PEX series Delivered with equipment funnel caps or downflow air air conditioners conditioners NetCol8000-A100s User Manual (delivered with equipment) Issue 02 (2015-06-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.
  • Page 200: Connecting Cables To The Data Center Management System

    A twisted pair, cord end terminal, and RJ45 connector have been prepared.  The following tools have been prepared: − Wire stripper − Crimping tool − RJ11 crimping tool Electrician's knife − Issue 02 (2015-06-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.
  • Page 201 Crimp the metal part of core end terminal A using a crimping tool. Figure 10-42 Preparing a cord end terminal Preparing an RS485 Monitoring Cable Figure 10-43 Figure 10-44 show how to prepare a cord end terminal. Issue 02 (2015-06-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.
  • Page 202 The method of preparing a dry contact monitoring cable is similar to the method of preparing an RS485 monitoring cable. Prepare cord end terminals on both ends of each required core wire based on the number of dry contacts. Issue 02 (2015-06-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.
  • Page 203: Port Description For The Ccu Collector

    Huawei communications equipment and the NetEco. One standard 10/100 M FE port that is used to communicate with Huawei communications equipment and the NetEco. Priority to select this port while connect collector and switch. The port connects to an electronic label.
  • Page 204 7 Brown and white ALM_ALL+ Positive main alarm output 8 Brown Ground end Table 10-26 Description of D_COM[0:2] port pins Description 1 Orange and white RS485 receive end Issue 02 (2015-06-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.
  • Page 205 3.3 V power output 2 Orange Floated 3 Green and white Ground end 4 Blue I2C communication port 5 Blue and white 6 Green Floated 7 Brown and white Issue 02 (2015-06-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.
  • Page 206 Water detection signal input Pin3 Ground end Pin4 Floated Table 10-32 Description of SMOKE port pins Description Pin1 12 V 12 V power output Pin2 SMOKE_IN Smoke detection signal Issue 02 (2015-06-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.
  • Page 207 The port connects to an infrared sensor or a vibration sensor. IN[0:4] The port detects Boolean values. The port exports control values. AD_IN[0:1] The port monitors the ambient temperature and humidity. Issue 02 (2015-06-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.
  • Page 208 Normally open (NO) contact Table 10-38 Description of AD_IN[0:1] port pins Name Description AD_IN[0:1] 12 V 12 V power output A0/A2 Temperature analog parameter input A1/A3 Humidity analog parameter input Issue 02 (2015-06-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.
  • Page 209 7 Brown and white Floated 8 Brown Ground end Table 10-42 Description of ports on the TCU expansion card Port Description VALVE The port controls the valve. Issue 02 (2015-06-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.
  • Page 210: Port Description For The Ecc Collector

    Table 10-44 Description of ports on the front panel of the RS485 communication card Silk Screen Port Description COM1, COM2, and COM3 Connect to intelligent equipment, such as the UPS, AC transfer switch (ATS), and air Issue 02 (2015-06-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.
  • Page 211 4 mA to 20 mA current signals, signals from current-based smoke sensors and water sensors, dry contact signals, and NTC signals.  1: Type_1  2: Type_2 Issue 02 (2015-06-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.
  • Page 212: Connecting A Monitoring Cable To A Ccu Collector

    8: GND 10.12.4 Connecting a Monitoring Cable to a CCU Collector Procedure Step 1 Connect cables to the CCU collector, as illustrated in Figure 10-45 Table 10-47. Issue 02 (2015-06-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.
  • Page 213: Connecting A Monitoring Cable To The Ecc Collector

    Table 10-48 Description of cables to the ECC collector Port Description Used to connect to the switch Used to connect to northbound equipment over RS485/RS232; reserved Used to connect to southbound equipment over RS485; reserved Issue 02 (2015-06-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.
  • Page 214: Connecting A Monitoring Cable To A Lan Switch

    Table 10-49 Description of LAN switch connections Port Description The ports connect to the server, collector, camera, and access controller. The port is a high throughput interface and connects to the Internet. ----End Issue 02 (2015-06-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.
  • Page 215: Connecting A Monitoring Cable To An Rh2288

    The port can connect to a monitor. Serial port, can connect the SMS modem. ----End 10.12.8 Cable Connection for the NetEco Figure 10-49 Figure 10-50 show the NetEco cable connection. Issue 02 (2015-06-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.
  • Page 216: Connecting Monitoring Cables To A Wcon-22Z Skylight Controller

    A monitoring cable has been prepared.  You are familiar with the functions of all ports on the CCU collector by referring to 10.12.2 Port Description for the CCU Collector. Issue 02 (2015-06-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.
  • Page 217 Step 2 Connect the MOTE OPEN port on the skylight controller to the DO port on the EEU environment expansion card in the CCU collector. Figure 10-51 shows the cable connections to the skylight controller. Issue 02 (2015-06-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.
  • Page 218 IDS2000 Dual-Row Aisle Containment Installation Guide (Split-type Skylight, Old-Version Sliding Door) 10 Cable Layout Figure 10-51 Cable connections to the skylight controller ----End Issue 02 (2015-06-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.
  • Page 219: Connecting A Monitoring Cable To A Wcon-14Z Skylight Ceiling Controller

    SMG ALM Connects to a CCU or an Available when closed. Set ECC. A smoke sensor alarm the port on the NetEco to Issue 02 (2015-06-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.
  • Page 220 1 (+ –) to 14 (+ –) ports skylight after the skylight lock is de-energized. of the skylight controller supply power to the magnetic lock. After you press the skylight open Issue 02 (2015-06-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.
  • Page 221 Connects to the positive pole (red) of the smoke sensor power source. Connects to the smoke sensor GND (black). Connects to the common end (green) of the Issue 02 (2015-06-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.
  • Page 222: Connecting A Monitoring Cable To A Camera

    Step 1 Connect the monitoring port on the camera to any network port on the switch by using the network cable. The switch is powered by using the power over Ethernet (PoE) technology. Issue 02 (2015-06-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.
  • Page 223: Connecting A Monitoring Cable To A Door Status Sensor

    Figure 10-53 Connecting a monitoring cable to a door status sensor Step 2 Install a door status sensor in a reverse order of Step Step 3 Connect a monitoring cable to the collector. Issue 02 (2015-06-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.
  • Page 224: Connecting A Monitoring Cable For The Sd-09A-Hwa Current-Type Smoke Sensor

    Connect the two cord end terminals to the converter on the smoke sensor, regardless of polarities. Connect one end of the RJ45 network cable to the AI/DI port on the ECC collector. ----End Issue 02 (2015-06-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.
  • Page 225: Connecting A Monitoring Cable To The Sdlh-94R Dry Contact-Type Smoke Sensor

    Table 10-55. Table 10-55 Cable terminal of the skylight controller Cables for the Smoke Sensor Cable Terminal of the skylight ceiling controller GND (black) Issue 02 (2015-06-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.
  • Page 226: Connecting A Monitoring Cable To A Ws302M2A-5 Ambient Temperature And Humidity Sensor

    Connect the ports of two humidity and temperature sensors. Table 10-57 describes the connection method. Issue 02 (2015-06-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.
  • Page 227: Connecting A Cable To The Wlds900 Water Sensor

    10-58. Table 10-58 Connecting a cable to the water sensor Wiring Terminal in the ALM_IN Port Core Wire in the Cord End Terminal Core wire 3 (green-white) Issue 02 (2015-06-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.
  • Page 228: Connecting Cables To The Sj535A Water Sensor

    Procedure Step 1 Remove the rear cover from the water sensor to expose the interior panel, as shown in Figure 10-54. Issue 02 (2015-06-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.
  • Page 229 Connect one end of the network cable to the Network port on the water sensor. Connect one end of the network cable to the AI/DI port on the ECC collector. ----End Issue 02 (2015-06-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.
  • Page 230: Connecting A Monitoring Cable To A Point Water Sensor

    Wiring Terminal in the ALM_IN Port Core Wire in the Cord End Terminal 12 V Core wire 3 (green-white) Core wire 8 (brown) Core wire 7 (brown-white) Core wire 6 (green) Issue 02 (2015-06-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.
  • Page 231: Connecting A Monitoring Cable To A Hydrogen Sensor

    ECC collector. ----End 10.12.20 Connecting a Monitoring Cable to an Access Controller in a Modular Data Center Context The access controller uses the 220 V power supply. Issue 02 (2015-06-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.
  • Page 232 Connecting Cables to a Door Exit Button and an Access Card Reader Figure 10-57 shows the cable connections to the access controller, door exit button, and access card reader. Issue 02 (2015-06-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.
  • Page 233: Connecting A Monitoring Cable To The Ms899 Electronic Door Lock

    A network cable required is prepared.  You are familiar with the functions of all ports on the CCU collector by referring to 10.12.2 Port Description for the CCU Collector. Issue 02 (2015-06-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.
  • Page 234 Connect the other end of the network cable to the RS485 port on the CCU collector.  If connected to an ECC collector, connect the RJ45 connector of the electronic door lock cable to the RS485 port on the ECC collector. ----End Issue 02 (2015-06-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.
  • Page 235: Installing The Sms Modem

    The SMS modem is connected to the network and is in Blinks slowly idle mode. Blinks quickly The SMS modem is in transmission mode. The SMS modem is deactivated. Issue 02 (2015-06-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.
  • Page 236: Connecting Monitoring Cables To A Lighting Control Box

    Connect the other end of cable 25030384 to the circuit breaker of the lighting power distribution box. Step 2 Connect monitoring cables to the lighting control box, as described in Figure 10-60. Issue 02 (2015-06-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.
  • Page 237: Optional) Connecting A Monitoring Cable To An Nvr

    A network cable used for monitoring has been prepared. Procedure Step 1 Connect one end of the network cable to the Ethernet port on the NVR, as shown in Figure 10-61. Issue 02 (2015-06-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.
  • Page 238: Connecting A Monitoring Cable To An Acrd502 Air Conditioner

    Step 1 Connect one end of the network cable to the network port on the ACRD502 air conditioner. Figure 10-62 shows the ports on the ACRD502 air conditioner. Issue 02 (2015-06-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.
  • Page 239: Connecting A Monitoring Cable To A Pex Air Conditioner

    The NetEco can communicate with a PEX air conditioner over SNMP or Modbus. The two communication modes require different cable connections.  If they communicate over SNMP, connect the TCP/IP card in the PEX air conditioner to the switch. Issue 02 (2015-06-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.
  • Page 240 RS485 card and the colors of core wires in the cord end terminal. Figure 10-64 RS485 card in the PEX air conditioner (1) RS485 port Issue 02 (2015-06-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.
  • Page 241: Connecting A Monitoring Cable To A Crv Air Conditioner

    RS485 card and the colors of core wires in the cord end terminal. Figure 10-65 RS485 card in the CRV air conditioner (1) RS485 port Issue 02 (2015-06-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.
  • Page 242: Connecting A Monitoring Cable To A Datamate3000 Air Conditioner (Method One)

    Table 10-68. Table 10-68 Connecting network cables Network Cable A Network Cable B Core wire 1 (orange-white), core wire 4 Core wire 7 (brown-white) (blue) Issue 02 (2015-06-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.
  • Page 243 Connect the RJ45 connector of network cable A to the RS485 port on the ECC. Connect the RJ45 connector of network cable B to the port at the top of the DataMate3000 air conditioner, as shown in Figure 10-66. ----End Issue 02 (2015-06-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.
  • Page 244: Connecting A Monitoring Cable To A Datamate3000 Air Conditioner (Method Two)

    Color of Core Wire in the Connected RS485 Port Cord End Terminal CCU collector Orange and white, blue Orange, blue and white ECC collector Orange and white Orange Issue 02 (2015-06-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.
  • Page 245: Connecting A Monitoring Cable To A Netcol5000-C025

    Type of the Collector Wiring Terminal in the Color of Core Wire in the Connected RS485 Port Cord End Terminal CCU collector Orange and white, blue Orange, blue and white Issue 02 (2015-06-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.
  • Page 246: Connecting A Monitoring Cable To A Netcol5000-C030

    NetCol5000-C030 main control board, and flip toggle switches 3 and 4 of DIP switch S1 to Figure 10-69 NetCol5000-C030 main control board (1) Teamwork communication & Monitoring communication port J73 (2) DIP switch S1 Issue 02 (2015-06-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.
  • Page 247: Connecting A Monitoring Cable To A Netcol5000-A

    A network cable used for monitoring has been prepared. Procedure Step 1 Connect one end of the network cable to the COM1 or COM2 port on the HIPULSE-NXL UPS, as shown in Figure 10-70. Issue 02 (2015-06-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.
  • Page 248: Connecting A Monitoring Cable To A Hipulse U Ups

    Step 2 Connect the other end of the network cable to the RS485 port on the CCU collector or ECC collector. ----End 10.12.36 Connecting a Monitoring Cable to a Galaxy7000 UPS Prerequisites A network cable used for monitoring is prepared. Issue 02 (2015-06-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.
  • Page 249: Connecting A Monitoring Cable To A Delta 120 Kva Ups

    Step 2 Connect the RJ45 connector of the RS485 monitoring cable to the RS485 port on the CCU collector or ECC collector. ----End 10.12.38 Connecting a Monitoring Cable to a Riello UPS Prerequisites A network cable used for monitoring is prepared. Issue 02 (2015-06-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.
  • Page 250: Connecting A Monitoring Cable To A Ups2000-G

    Step 1 Connect one end of the network cable to the Ethernet port on monitor in the UPS5000-E. Step 2 Connect the other end of the network cable to the Ethernet port on the switch. Issue 02 (2015-06-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.
  • Page 251: Connecting A Monitoring Cable To A Ups8000-D

    Figure 10-72 SNMP card (1) SNMP card (optional) (2) SNMP card (optional) Step 2 Connect the other end of the network cable to the Ethernet port on the switch. ----End Issue 02 (2015-06-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.
  • Page 252: Connecting A Monitoring Cable To A Yd2010 Coulometer

    Orange and white RS485- Orange Step 2 Connect the RJ45 connector of the RS485 monitoring cable to the RS485 port on the CCU collector or ECC collector. ----End Issue 02 (2015-06-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.
  • Page 253: Connecting A Monitoring Cable To A Pd800 Coulometer

    Step 2 Connect the cord end terminal of the RS485 monitoring cable to the RS485 port in the PDU8000. Table 10-74 lists the mapping between the wiring terminals in the RS485 port and the colors of core wires in the cord end terminal. Issue 02 (2015-06-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.
  • Page 254: Connecting A Monitoring Cable To A Pd510 Coulometer

    Locate the RS485 port on the rear of the coulometer and the other end of the cable. The port to which the other end connects is the RS485 port. Issue 02 (2015-06-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.
  • Page 255: Connecting A Monitoring Cable To An Abb Otm Ats

    Step 1 Connect the cord end terminal of the RS485 monitoring cable to the RS485 port in the PDU8000. Table 10-76 lists the mapping between the wiring terminals in the RS485 port and the colors of core wires in the cord end terminal. Issue 02 (2015-06-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.
  • Page 256: Connecting A Monitoring Cable To A Tu520A Ats

    Step 1 View the PDU8000 conceptual diagram and determine that port A for the ATS on the wiring terminal block is numbered 16 and port B is numbered 17, as shown in Figure 10-74. Issue 02 (2015-06-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.
  • Page 257: Connecting A Monitoring Cable To A Pdu8000-0250Acv4-Sca005

    Step 3 Connect the RJ45 connector of the RS485 monitoring cable to the RS485 port on the CCU collector or ECC collector. ----End 10.12.48 Connecting a Monitoring Cable to a PDU8000-0250ACV4-SCA005 Prerequisites A network cable used for monitoring has been prepared. Issue 02 (2015-06-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.
  • Page 258: Connecting Cables To The Fire Extinguishing System

    The cables cannot be extruded or damaged. Do not make cables cross each other.  Use terminal boards that are crimped or with tin solder joints in wiring terminal boxes. The wiring terminals should be numbered. Issue 02 (2015-06-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.
  • Page 259 After cables are routed, use a 500 V megohm multimeter to conduct a comprehensive phase-to-phase and phase-to-ground insulation test on trunk and branch cables before installing equipment. The insulation resistance should be at least 20 megohm. Issue 02 (2015-06-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.
  • Page 260: Check After Installation

    □Passed. □Failed. The cabinet has no waste tape, cable ties, paper, or packing materials around □Passed. □Failed. All components are properly installed and no component is left onsite. Issue 02 (2015-06-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.
  • Page 261 □Passed. □Failed. The length of ground cables and power cables is correct. □Passed. □Failed. Lugs for power cables and PGND cables are soldered or crimped Issue 02 (2015-06-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.
  • Page 262 Battery safety valves remain intact and experience no acid leakage. □Passed. □Failed. Storage batteries are connected correctly. □Passed. □Failed. DIP switches on devices are correctly set. Customer Sign: Check Data: Issue 02 (2015-06-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.
  • Page 263: A Appendix

    Step 2 Put a combining bar on the UPS sealing support, and screw it into the cabinet by using M5x10 tapping screws, as shown in Figure A-2. Issue 02 (2015-06-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.
  • Page 264 Step 4 Secure the UPS sealing support to the sealing plates on the bottom of the adjacent cabinets using M6x16 screws. Figure A-3 shows the installation sequence. Figure A-3 Installing sealing plates ----End Issue 02 (2015-06-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.
  • Page 265: Installing Skylight Sealing Kits (For Double Doors)

    M6 screw assemblies, as shown in Figure A-5 (rear view) and Figure A-6 (front view). Figure A-5 Inserting the connecting kits (rear view of the skylight sealing kit) Issue 02 (2015-06-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.
  • Page 266 Step 5 Level the upper surface of the skylight sealing kit by adjusting the captive screws for the sealing plates and connecting kits and using a level instrument. Figure A-8 shows the positions of the tuning screws. Issue 02 (2015-06-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.
  • Page 267: Optional) Installing Double-Swing Doors

    Figure A-9 Securing lower connection plates for the posts Align the upper connection plates with the lower ones. Insert the posts of the double-swing door into the connection plates, and screw the posts. Issue 02 (2015-06-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.
  • Page 268 Pull out the axle pins from the static hinges on the posts, as shown in Figure A-11. Raise the door, adjust the angle between the door and the cabinets to 20 degrees, and clamp the acting hinges into the static hinges. Issue 02 (2015-06-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.
  • Page 269 If a large gap exists between the top of the two door panels and the bottom of the doorhead, adjust the bolts between the posts and the cabinet. Adjust the screws to ensure that all door gaps are even, as shown in Figure A-13. Issue 02 (2015-06-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.
  • Page 270: Optional) Connecting Linkage Cables Between The Gas Extinguishing Controller And Ats

    Connect linkage cables between the drive output ports for the fire alarm bell on the gas extinguishing controller and the non-fire power disconnection ports on the ATS, as shown in Figure A-14. Issue 02 (2015-06-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.
  • Page 271 ATS, as shown in Figure A-15. Figure A-15 Connecting linkage cables between the audible and visual alarm and ATS ----End Issue 02 (2015-06-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.
  • Page 272: Optional) Connecting Linkage Cables Between The Fire Extinguishing System And Access Controller

    A1 and A2 cable connections between the WCON-14Z skylight controller and the eight-access controller). Figure A-17 Connecting cables between the skylight controller and access controller Issue 02 (2015-06-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.
  • Page 273: Cable List

    Yellow, Green, Red, Blue, Black), 328 a 250 A PDU8000) A, 4x95 mm² +1x50 mm² Naked Crimping Terminal, DT, 95 14170164 , M12, 320 A, Tin Plating Issue 02 (2015-06-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.
  • Page 274 Cores: Yellow, Green, Red, Blue, a 630 A PDU8000) Black), 382 A, 4x120 mm +1x70 mm Naked Crimping Terminal, DT, 120 14170163 , M12, 380 A, Tin Plating Issue 02 (2015-06-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.
  • Page 275 Power Cable, 300/500 V, 60227IEC10 Power cable for the single-phase 16 25030421 (BVV), 3x2.5 mm , Black (Cores: A (3.5 kW) PDU2000 Blue, Brown, Yellow/Green), 27 A, Issue 02 (2015-06-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.
  • Page 276 AWG, Yellow 25030423 Power Cable, 300 V, 60227IEC10 Power cable for the single-phase 63 (BVV), 16 mm , Black Jacket (Cores: A PDU2000 Blue, Brown, Yellow/Green), 85 A, Issue 02 (2015-06-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.
  • Page 277 Naked Crimping Terminal, Single-Wire Cord End Terminal, 1 , Insertion Depth 6 mm, Yellow Naked Crimping Terminal, 14170203 Multi-Wire Cord End Terminal, 2 , 30 A, Sn, 16–14 AWG Issue 02 (2015-06-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.
  • Page 278 25 mm , M8, Tin Plating, Naked Ring Terminal 25030419 Wire, 450 V/750 V, 60227 IEC Battery cabinet ground cable 02 (RV), 35 mm Green-and-Yellow, 135 A, Issue 02 (2015-06-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.
  • Page 279 Naked Crimping Terminal, DT, 14170166 50 mm , M12, 200 A, Tin Plating 25030443 Wire, 450 V/750 V, 60227 IEC Ground bus from the 400 A/500 Issue 02 (2015-06-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.
  • Page 280 AWG, Pitch 5.08 mm, Male and Female Using Together, Only for Power Supply 25031053 Power Cable, 300 V, UL2464, 0.56 mm Cable between the card reader 20 AWG, Black (7 Cores: Red, Black, Issue 02 (2015-06-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.
  • Page 281 Electronic and Power Cable, 300 V, 60227 IEC 53 Power cable (RVV), 1 mm , 1.0 mm , Black, 10 A, 3-Core, Only between the For OEM skylight controller Issue 02 (2015-06-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.
  • Page 282 V, 10 A, 1.5 m, C14SM, 227IEC53, 1.0 mm^2 server, monitoring (3C), C13SF switch, and collector 25050014 Twisted-Pair Cable, 100 ohms, Category 5e UTP, Cable between the Issue 02 (2015-06-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.
  • Page 283 Terminal, 0.25 mm , 0.012 m, Insertion Depth 6 mm, 2 A, Light Blue For the specifications for the UPS and air conditioner cables, see the delivered documentation. Issue 02 (2015-06-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.

Table of Contents