Panasonic LP-RF Series Setup & Maintenance Manual page 150

Laser marker
Hide thumbs Also See for LP-RF Series:
Table of Contents

Advertisement

„ Marking - Image checking (when TIMING IN signal is used)
TRIGGER IN (X5)
TIMING IN (No.24)
READY OUT (Y5)
TIMING WAIT OUT (No.36)
CHECK OK OUT (No.34)
or
CHECK NG OUT (No.35)
PROCESSING OUT (Y10)
LASING OUT (No.40)
SCRIPTING OUT (No.37)
PROCESSING END OUT (Y11)
*1: CHECK OK OUT (No.34) / CHECK NG OUT (No.35) outputs before PROCESSING OUT (Y10) is turned OFF.
Item
Time
T1
2ms or more
T2
T3
T4
T5
Max. 60 sec.
T6
T7
2 to 510 ms
150
ON
T1
OFF
Starting marking signal
ON
OFF
ON
OFF
ON
OFF
ON
OFF
ON
OFF
ON
T3
OFF
ON
OFF
ON
OFF
Remarks
Keep the ON status for 2ms or more.
When TRIGGER IN (X5) is accepted, PROCESSING OUT (Y10) turns ON.
The output time of PROCESSING OUT includes the trigger delay time, operation time,
laser radiation time and laser marker internal processing time of the linkage devices.
Laser radiation time. This varies depending on marking contents.
Processing time of communication and linkage operations with the image checker.
For code checking or character checking, time for transferring the marking data to the
image checker by the laser marker is included.
Turn on TIMING IN within 60 seconds after TIMING WAIT OUT is turned ON.
If there is no input of TIMING IN within 60 seconds, an error occurs and trigger processing
is terminated due to the abnormality.
Processing time of linkage operations with the image checker.
In this case, it is the following time.
• Time for reading by the image checker
• Time for transferring the checkup results from the image checker to the laser marker
One-shot output. Set the output time on the system settings screen.
There is a small margin of error for the setting value.
ME-LPRF-SM-11
T1
Starting image checking signal
T4
T5
T6
T2
*1
T7
T7

Advertisement

Table of Contents

Troubleshooting

loading

This manual is also suitable for:

Lp-rf200p

Table of Contents