Assembling the JG Terminal and Power Cable
Context
Figure 5-6 shows the components of a JG terminal and a power cable.
Figure 5-6 Components of a JG terminal and a power cable
A. JG
terminal
Procedure
Step 1 Strip a part of the insulation to expose the cable conductor with a length of L, as shown in
Figure 5-7. The recommended values of L are listed in Table 5-2.
Issue 01 (2016-04-15)
B. Heat-shrinkable
tubing
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
C. Insulation layer of a
power cable
5 Appendix
D. Conductor of a
power cable