5
GOT SETTINGS
Create a new GOT project and configure the settings to sample the resource data.
5.1
Creating a New Project
Create a new GOT project. Set the following in GT Designer3.
Operating procedure
1.
Start GT Designer3.
2.
Set as follows in the New Project Wizard and create a new project.
5 GOT SETTINGS
5.1 Creating a New Project
5
48