Start-up

Contents of this chapter

This chapter describes the start-up procedure of the ACS880-207 IGBT supply units.
The underlined tasks are needed for certain cases only. The option codes (if any) are given
in brackets. The default device designations (if any) are given in square brackets. For
example: Supply unit with the grounding switch ([Q9], option +F259). The same device
designations are also used in the circuit diagrams, typically.
These instructions cannot cover all possible start-up tasks of a customized drive. Always
refer to the delivery-specific circuit diagrams when proceeding with the start-up.
WARNING!
Only qualified electricians are allowed to do the work described in this chapter.
Read the safety instructions given in Safety instructions for ACS880 multidrive
cabinets and modules (3AUA0000102301 [English]). Ignoring the instructions can
cause physical injury or death, or damage to the equipment.
Note: For the functional safety options (for example options +Q951, +Q952, +Q963, +Q964
and +Q979), the start-up instructions are given in separate option manuals, not in this
chapter. Reserve the necessary option manuals at hand before performing the supply unit
start-up and follow also their instructions. See section
Note: Before you activate the automatic fault reset or automatic restart functions of the drive
control program, make sure that no dangerous situations can occur. These functions reset
the drive automatically and continue operation after a fault or supply break. If these functions
are activated, the installation must be clearly marked as defined in IEC/EN 61800-5-1,
subclause 6.5.3, for example, "THIS MACHINE STARTS AUTOMATICALLY".