Checking And Replacing The Ac Fuses (Frame R8I And Multiples) - ABB ACS880-207 Hardware Manual

Industrial drives, igbt supply units
Hide thumbs Also See for ACS880-207:
Table of Contents

Advertisement

112 Maintenance
4. DC fuses (a) are located on top of the IGBT supply module. Check the condition of the
fuses. In case of a blown fuse, replace all fuses with similar fuses: slacken the nuts of
the fuses and pull the fuses out. Do not unscrew the nuts completely, not to drop them
inside the module below. Tighten the nuts by hand or applying maximum 5 N·m force.
Tightening torques for nuts are:
Nut
M12
5. Attach the shrouds in reverse order and close the door.

Checking and replacing the AC fuses (frame R8i and multiples)

WARNING!
Only qualified electricians are allowed to this work. Read the complete safety
instructions of the drive. Ignoring the instructions can cause physical injury or
death, or damage to the equipment.
1. Disconnect the drive from the AC power line and make sure it is safe to start the work.
See section
Electrical safety precautions (page
2. Open the IGBT supply module cubicle door.
3. Undo the screws of the shroud in the upper part of the cubicle. Lift and remove the
shroud.
4. AC fuses (b) are located on top of the LCL filter module. Check the condition of the
fuses. In case of a blown fuse, replace all fuses with similar fuses: slacken the nuts of
the fuses and pull the fuses out. Do not unscrew the nuts completely, not to drop them
inside the module below. Tighten the nuts first by hand or applying maximum 5 N·m
force. Tightening torques for nuts are:
Nut
M12
5. Attach the shroud and close the door.
Cooper Bussmann fuses
50 N·m
46).
Cooper Bussmann fuses
50 N·m
Mersen (Ferraz-Shawmut) fuses
46 N·m
Mersen (Ferraz-Shawmut) fuses
46 N·m

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents