PDU8000 Modular Precision Power Distribution Cabinet
User Manual (1100 mm Deep)
No.
6
7
8
9
5.4.2 Power Cable Specifications
YJV5 cables are recommended. When the ambient temperature is 40° C, the conductor
working temperature cannot exceed 90° C.
Table 5-7 Power cable specifications
Wiring
Terminal
Power input
(L/N)
Power input
(PE)
AC output
(L)
AC output
(N/PE)
Issue 01 (2019-02-25)
Cable Layout Rule
Connection ports and cabling methods facilitate maintenance, cable
routing, and capacity expansion.
Cable connectors prepared onsite must be normal, secure, reliable, and
neat.
Power cables, ground cables, and various signal cables are securely
connected. Adapters are securely plugged or screwed.
The N and PE cables are bound separately from the L1/L2/L3 or L cables
for each circuit breaker. Cables are converged at the beam and bound in
groups by cable ties.
Rated
Cable
Current
Diameter
160 A
50 mm
250 A
95 mm
400 A
185 mm
630A
2× 150 mm
160 A
25 mm
250 A
50 mm
400 A
95 mm
630A
2× 70 mm
< 10 A
2.5 mm
10 A ≤ I ≤ 40
6 mm
A
40 A < I ≤ 63
10 mm
A
< 10 A
2.5 mm
10 A ≤ I ≤ 40
6 mm
A
Copyright © Huawei Technologies Co., Ltd.
Terminal/Bolt
Specifications
2
DT-M10
2
DT-M12
2
DT-M16
2
DT-M12
2
DT-M10
2
DT-M10
2
DT-M12
2
DT-M12
2
Cord end terminal
(plug depth 8–12
mm)
2
Cord end terminal
(plug depth 8–12
mm)
2
Cord end terminal
(plug depth 8–12
mm)
2
OT-M6
2
OT-M6
5 Installation Guide
Recommended
Torque
26–33 N· m
46–58 N· m
46–58 N· m
46–58 N· m
26–33 N· m
26–33 N· m
46–58 N· m
46–58 N· m
1.5–1.8 N· m
1.5–1.8 N· m
1.5–1.8 N· m
4.9 N· m
4.9 N· m
48