PDU8000 Modular Precision Power Distribution Cabinet
User Manual (1100 mm Deep)
Figure 5-27 Removing the transparent cover of the N bar
Figure 5-28 Removing the transparent cover of the input copper bar
Step 4 Secure one end of the ground cable to the ground bar inside the PDC, and secure the other end
to the ground grid or busbar of the equipment room.
Issue 01 (2019-02-25)
Copyright © Huawei Technologies Co., Ltd.
5 Installation Guide
55