PDU8000 Modular Precision Power Distribution Cabinet
User Manual (1100 mm Deep)
Figure 5-29 Installing a Ground Cable
Step 5 Connect input power cables.
Issue 01 (2019-02-25)
Ground positions are reserved on the left and right sides at the upper part of the PDC. Select one ground
position based on the position of the ground grid or busbar.
Copyright © Huawei Technologies Co., Ltd.
5 Installation Guide
56