Advertisement

IPE
V100R001C03SPC200
Installation Guide
Issue
03
Date
2013-02-28
HUAWEI TECHNOLOGIES CO., LTD

Advertisement

Table of Contents
loading

Summary of Contents for Huawei IPE Series

  • Page 1 V100R001C03SPC200 Installation Guide Issue Date 2013-02-28 HUAWEI TECHNOLOGIES CO., LTD...
  • Page 2 Notice The purchas ed products, servic es and feat ures are stipulated by the contract made between Huawei and the customer. All or part of the products, services and features described in this document may not be within the purchase scope or the usage scope.
  • Page 3: About This Document

    Provides a tip that may help you solve a problem or save time. Provides additional information to emphasize or supplement important points in the main text. Huawei Proprietary and Confidential Issue 03 (2013-02-28) Copyright © Huawei Technologies Co., Ltd...
  • Page 4 Update the procedure for installing a day & night high speed dome IPC and related figures. Chapter 8 Installing an Infrared High Speed Dome IPC Update the procedure for installingan infrared high speed dome IPC and related figures. Huawei Proprietary and Confidential Issue 03 (2013-02-28) Copyright © Huawei Technologies Co., Ltd...
  • Page 5 Installation Guide About This Document Issue 01 (2012-07-15) This issue is the first official release. Huawei Proprietary and Confidential Issue 03 (2013-02-28) Copyright © Huawei Technologies Co., Ltd...
  • Page 6: Table Of Contents

    6.2.3 Installing the IPC on a Wall-Mounted Bracket....................55 6.2.4 Installing the IPC on a Ceiling-Mounted Bracket ....................60 7 Installing a Day & Night High Speed Dome IPC..............66 7.1 Installat ion Preparat ions ..............................66 Huawei Proprietary and Confidential Issue 03 (2013-02-28) Copyright © Huawei Technologies Co., Ltd...
  • Page 7 8.1 Installat ion Preparat ions ..............................77 8.2 Installat ion Mode ................................78 8.3 Installat ion Procedure..............................78 8.3.1 Installing the IPC on the Wall..........................78 8.3.2 Installing the IPC on the Ceiling.........................83 Huawei Proprietary and Confidential Issue 03 (2013-02-28) Copyright © Huawei Technologies Co., Ltd...
  • Page 8: Installation Precautions

    When using the IPC, comply with the local electrical security standards and uses LPS- compliant power adapters.  Use accessories delivered with the IPC. The voltage of the power supply must meet the input voltage requirement of the IPC. Huawei Proprietary and Confidential Issue 03 (2013-02-28) Copyright © Huawei Technologies Co., Ltd...
  • Page 9 Keep the IPC far away from a heat source or exposed ignition source, such as the electric heater and candle.  Do not install or use the IPC in the areas with highly flammable or explosive objects. Huawei Proprietary and Confidential Issue 03 (2013-02-28) Copyright © Huawei Technologies Co., Ltd...
  • Page 10: Installing The Housing Of A Box Ipc

    Table 2-1 Installation tools and accessories Tool Appearance Remark Phillips screwdriver Prepared by yourself Claw hammer Percussion drill Horizontal ruler Universal adapter for a Delivered with the IPC box IPC Mounting block Huawei Proprietary and Confidential Issue 03 (2013-02-28) Copyright © Huawei Technologies Co., Ltd...
  • Page 11: Installation Mode

    10 mm above the installation plate, as shown in Figure 2-2. Then, use the Phillips screwdriver to fasten screws of the shield onto the installation plate. Huawei Proprietary and Confidential Issue 03 (2013-02-28) Copyright © Huawei Technologies Co., Ltd...
  • Page 12 IPC focus is adjusted. Then, use the screws on the shield to fix the installation plate of the IPC onto the IPC, as shown in Figure 2-3. Figure 2-3 Installing the IPC and installation plate inside the housing Housing Box IPC Huawei Proprietary and Confidential Issue 03 (2013-02-28) Copyright © Huawei Technologies Co., Ltd...
  • Page 13 Use a percussion drill bit with a diameter of 8 mm to drill three holes that are 40 mm deep. Figure 2-6 shows the installation dimensions (in the unit of mm) of the bracket. Huawei Proprietary and Confidential Issue 03 (2013-02-28) Copyright © Huawei Technologies Co., Ltd...
  • Page 14 Step 8 Install the bracket and housing together in the designated place and fasten three screws, as shown in Figure 2-7. Figure 2-7 Fixing the housing ----End Huawei Proprietary and Confidential Issue 03 (2013-02-28) Copyright © Huawei Technologies Co., Ltd...
  • Page 15: Installing An Infrared Waterproof Tube-Type Ipc I

    Table 3-1 Installation tools and accessories Tool Appearance Remark Phillips screwdriver Prepared by yourself Claw hammer Percussion drill Horizontal ruler Expansion particle Delivered with the IPC Self-tapping screw L-Wrench Huawei Proprietary and Confidential Issue 03 (2013-02-28) Copyright © Huawei Technologies Co., Ltd...
  • Page 16: Installat Ion Mode

    The wall where the bracket is installed must be able to bear at least three times of the total weight of the bracket and the IPC. 3.3 Installation Procedure Step 1 Stick the positioning label on the wall, as shown in Figure 3-1. Huawei Proprietary and Confidential Issue 03 (2013-02-28) Copyright © Huawei Technologies Co., Ltd...
  • Page 17 Figure 3-2. Figure 3-2 Installing the expansion particles Step 3 Mount the IPC on the wall and fasten the screws, as shown in Figure 3-3. Huawei Proprietary and Confidential Issue 03 (2013-02-28) Copyright © Huawei Technologies Co., Ltd...
  • Page 18 Step 5 Adjust the IPC horizontally and vertically so that the IPC faces the monitored area, as shown in Figure 3-4. Figure 3-4 Adjusting the monitoring direction of the IPC Huawei Proprietary and Confidential Issue 03 (2013-02-28) Copyright © Huawei Technologies Co., Ltd...
  • Page 19 Step 6 Unscrew the front cone of the IPC. Adjust the lens and check images on the analog monitor that has been connected in Step 4 until the captured images are clear. Then, lock the lens and screw the front cone of the IPC. ----End Huawei Proprietary and Confidential Issue 03 (2013-02-28) Copyright © Huawei Technologies Co., Ltd...
  • Page 20: Installing An Infrared Waterproof Tube-Type Ipc Ii

    Table 4-1 Installation tools and accessories Tool Appearance Remark Phillips screwdriver Prepared by yourself Claw hammer Percussion drill Horizontal ruler L-Wrench Delivered with the IPC Stainless hexagon screw Huawei Proprietary and Confidential Issue 03 (2013-02-28) Copyright © Huawei Technologies Co., Ltd...
  • Page 21: Installation Mode

    Step 1 Take out the positioning label delivered with the IPC and stick the label on the ceiling or wall where the IPC will be installed, as shown in Figure 4-1. Huawei Proprietary and Confidential Issue 03 (2013-02-28) Copyright © Huawei Technologies Co., Ltd...
  • Page 22 Step 2 Drill four holes with a diameter of 5.5 mm on the ceiling or wall based on the marks on the positioning label, as shown in Figure 4-2. Huawei Proprietary and Confidential Issue 03 (2013-02-28) Copyright © Huawei Technologies Co., Ltd...
  • Page 23 Step 4 Take out the mounting base and stainless self-tapping screws that are delivered with the IPC. Use the stainless self-tapping screws to secure the mounting base onto the ceiling or wall, as shown in Figure 4-4. Huawei Proprietary and Confidential Issue 03 (2013-02-28) Copyright © Huawei Technologies Co., Ltd...
  • Page 24 Slot on the base Screw Step 6 Adjust the position of the IPC, expose the cable outlet, and connect the multi-connector cable of the IPC, as shown in Figure 4-6. Huawei Proprietary and Confidential Issue 03 (2013-02-28) Copyright © Huawei Technologies Co., Ltd...
  • Page 25 Figure 4-7 Aligning the screw holes Step 8 Take out the four hexagon screws and L-Wrench. Use the L-wrench to fix the IPC on the mounting base, as shown in Figure 4-8. Huawei Proprietary and Confidential Issue 03 (2013-02-28) Copyright © Huawei Technologies Co., Ltd...
  • Page 26 Step 10 Adjust the angle of the IPC so that the IPC faces the monitored area, as shown in Figure 4-10, Figure 4-11, and Figure 4-12. Figure 4-9 Loosening screws Screw 1 Screw 2 Screw 3 Huawei Proprietary and Confidential Issue 03 (2013-02-28) Copyright © Huawei Technologies Co., Ltd...
  • Page 27 Installation Guide 4 Installing an Infrared Waterproof Tube-Type IPC II Figure 4-10 Rotating the mounting base of the IPC Figure 4-11 Rotating the IPC Huawei Proprietary and Confidential Issue 03 (2013-02-28) Copyright © Huawei Technologies Co., Ltd...
  • Page 28 Installation Guide 4 Installing an Infrared Waterproof Tube-Type IPC II Figure 4-12 Rotating the front placket of the IPC Step 11 Fasten screws. ----End Huawei Proprietary and Confidential Issue 03 (2013-02-28) Copyright © Huawei Technologies Co., Ltd...
  • Page 29: Installing A Vandal-Proof Dome Ipc

    Prepared by yourself Claw hammer Percussion drill Horizontal ruler Black cross recessed screw Delivered with the IPC with collar Black cross round head screw (US standard) T15 star L-wrench Huawei Proprietary and Confidential Issue 03 (2013-02-28) Copyright © Huawei Technologies Co., Ltd...
  • Page 30: Installation Mode

    The vandal-proof dome IPC can be installed on the ceiling, wall, or a wall-mounted or ceiling-mounted bracket. You can select an installation mode based on your requirements. Huawei Proprietary and Confidential Issue 03 (2013-02-28) Copyright © Huawei Technologies Co., Ltd...
  • Page 31: Installing The Ipc On The Ceiling

    Step 1 Use the T15 star L-wrench to loosen the three white star screws on the upper cover to open the dome, as shown in Figure 5-2. Figure 5-2 Opening the dome Upper cover Huawei Proprietary and Confidential Issue 03 (2013-02-28) Copyright © Huawei Technologies Co., Ltd...
  • Page 32 Each hole is 40 mm deep. Use a hammer or a hard object to drive three white expansion particles into the drilled holes, as shown in Figure 5-4. Ensure that the expansion particles do not project out of the ceiling. Huawei Proprietary and Confidential Issue 03 (2013-02-28) Copyright © Huawei Technologies Co., Ltd...
  • Page 33 Top cable outlet Positioning label Side cable outlet Three black self-tapping screws Step 6 Route the multi-connector cable that is removed in Step 2, as shown in Figure 5-6. Huawei Proprietary and Confidential Issue 03 (2013-02-28) Copyright © Huawei Technologies Co., Ltd...
  • Page 34 Figure 5-7. NOTE If the module is found loose after the video adjustment is complete, use a flat -head screwdriver to fasten the screws on the module again. Huawei Proprietary and Confidential Issue 03 (2013-02-28) Copyright © Huawei Technologies Co., Ltd...
  • Page 35 Hold the upper cover with one hand, and use the T15 star L-wrench with the other hand to fasten the three star screws on the upper cover, as shown in Figure 5-8. Huawei Proprietary and Confidential Issue 03 (2013-02-28) Copyright © Huawei Technologies Co., Ltd...
  • Page 36 Each hole is 40 mm deep. Use a hammer to drive three white expansion particles into the drilled holes, as shown in Figure 5-9. Ensure that the expansion particles do not project out of the ceiling. Huawei Proprietary and Confidential Issue 03 (2013-02-28) Copyright © Huawei Technologies Co., Ltd...
  • Page 37 Step 5 Hold the IPC with one hand, and use the T15 star L-wrench with the other hand to fasten the three black self-tapping screws onto the ceiling, as shown in Figure 5-10. Huawei Proprietary and Confidential Issue 03 (2013-02-28) Copyright © Huawei Technologies Co., Ltd...
  • Page 38 Step 6 Lock the inner liner on the bracket and use the T15 star L-wrench to fasten the three star screws on the upper cover, as shown in Figure 5-11. Huawei Proprietary and Confidential Issue 03 (2013-02-28) Copyright © Huawei Technologies Co., Ltd...
  • Page 39: Installing The Ipc On The Wall

    You can install the IPC on a wall using the white lower cover or directly through the black module base, as shown in Figure 5-12. In this case, the side cabling mode is often used for cable routing. Huawei Proprietary and Confidential Issue 03 (2013-02-28) Copyright © Huawei Technologies Co., Ltd...
  • Page 40: Installing The Ipc On A Wall-Mounted Bracket

    This type of dome IPC can be installed on the wall using a wall-mounted bracket, as shown in Figure 5-13. This installation mode increases the application scope of the IPC. Huawei Proprietary and Confidential Issue 03 (2013-02-28) Copyright © Huawei Technologies Co., Ltd...
  • Page 41 The lower cover is not used for this installation mode. NOTE For details about how to disassemble the dome IPC, see Step 1 and Step 2 in section5.2.1 "Installation Precautions." Huawei Proprietary and Confidential Issue 03 (2013-02-28) Copyright © Huawei Technologies Co., Ltd...
  • Page 42 Figure 5-15. (Spare screws are available in the accessory kit of the wall-mounted bracket.) Figure 5-15 Fixing the black lower cover of the IPC onto the bracket Multi connector cable Black screws Huawei Proprietary and Confidential Issue 03 (2013-02-28) Copyright © Huawei Technologies Co., Ltd...
  • Page 43 Hold the bracket with one hand, and align the four holes on the lower cover with the four expansion particles installed on the wall. Use the four black self-tapping screws to fix the bracket on the wall, as shown in Figure 5-17. Huawei Proprietary and Confidential Issue 03 (2013-02-28) Copyright © Huawei Technologies Co., Ltd...
  • Page 44 If the module is found loose after the video adjustment is complete, fasten the screws on the module again and then install the upper cover of the dome IPC. Huawei Proprietary and Confidential Issue 03 (2013-02-28) Copyright © Huawei Technologies Co., Ltd...
  • Page 45: Installing The Ipc On A Ceiling-Mounted Bracket

    5.2.4 Installing the IPC on a Ceiling-Mounted Bracket The IPC can be installed on a bracket that is mounted on the indoor ceiling or under the roof, as shown in Figure 5-19. Huawei Proprietary and Confidential Issue 03 (2013-02-28) Copyright © Huawei Technologies Co., Ltd...
  • Page 46 The lower cover is not used for this installation mode. NOTE For details about how to disassemble the dome IPC, see Step 1 and Step 2 in section 5.2.1 "Installation Precautions." Huawei Proprietary and Confidential Issue 03 (2013-02-28) Copyright © Huawei Technologies Co., Ltd...
  • Page 47 Figure 5-21 Routing the cable Three black screws Multi connector cable Step 4 Stick the positioning label delivered with the IPC at the installation position of the dome. Huawei Proprietary and Confidential Issue 03 (2013-02-28) Copyright © Huawei Technologies Co., Ltd...
  • Page 48 Use the four black self- tapping screws to fix the bracket onto the ceiling, as shown in Figure 5-23. Huawei Proprietary and Confidential Issue 03 (2013-02-28) Copyright © Huawei Technologies Co., Ltd...
  • Page 49 If the module is found loose after the video adjustment is complete, fasten the screws on the module again and then install the inner liner and upper cover of the dome IPC. Huawei Proprietary and Confidential Issue 03 (2013-02-28) Copyright © Huawei Technologies Co., Ltd...
  • Page 50 5 Installing a Vandal-Proof Do me IPC Figure 5-24 Install the inner liner and upper cover of the dome IPC Horizontally rotating Vertically rotating Inner liner Upper cover ----End Huawei Proprietary and Confidential Issue 03 (2013-02-28) Copyright © Huawei Technologies Co., Ltd...
  • Page 51: Installing An Infrared Dome Ipc

    Prepared by yourself Claw hammer Percussion drill Horizontal ruler Black cross recessed screw Delivered with the IPC with collar Black cross round head screw (US standard) T15 star L-wrench Huawei Proprietary and Confidential Issue 03 (2013-02-28) Copyright © Huawei Technologies Co., Ltd...
  • Page 52: Installation Mode

    The vandal-proof dome IPC can be installed on the ceiling, wall, or a bracket that is installed on the wall or ceiling. You can select an installation mode based on your requirements. Huawei Proprietary and Confidential Issue 03 (2013-02-28) Copyright © Huawei Technologies Co., Ltd...
  • Page 53: Installing The Ipc On The Ceiling

    Step 1 Use the T15 star L-wrench to loosen the three white star screws on the upper cover to open the dome, as shown in Figure 6-2. Figure 6-2 Opening the dome Upper cover Huawei Proprietary and Confidential Issue 03 (2013-02-28) Copyright © Huawei Technologies Co., Ltd...
  • Page 54 Each hole is 40 mm deep. Use a hammer or a hard object to drive three white expansion particles into the drilled holes, as shown in Figure 6-4. Ensure that the expansion particles do not project out of the ceiling. Huawei Proprietary and Confidential Issue 03 (2013-02-28) Copyright © Huawei Technologies Co., Ltd...
  • Page 55 Figure 6-5 Loosening the star screws Top cable outlet Positioning label Side cable outlet Three black self-tapping screws Step 6 Route the multi-connector cable, as shown in Figure 6-6. Huawei Proprietary and Confidential Issue 03 (2013-02-28) Copyright © Huawei Technologies Co., Ltd...
  • Page 56 Figure 6-7. NOTE If the module is found loose after the video adjustment is complete, use a flat-head screwdriver to fasten the screws on the module again. Huawei Proprietary and Confidential Issue 03 (2013-02-28) Copyright © Huawei Technologies Co., Ltd...
  • Page 57 Hold the upper cover with one hand, and use the T15 star L-wrench with another hand to fasten the three star screws on the upper cover, as shown in Figure 6-8. Huawei Proprietary and Confidential Issue 03 (2013-02-28) Copyright © Huawei Technologies Co., Ltd...
  • Page 58 Each hole is 40 mm deep. Use a hammer to drive three white expansion particles into the drilled holes, as shown in Figure 6-9. Ensure that the expansion particles do not project out of the ceiling. Huawei Proprietary and Confidential Issue 03 (2013-02-28) Copyright © Huawei Technologies Co., Ltd...
  • Page 59 Step 5 Hold the IPC with one hand, and use the T15 star L-wrench with the other hand to fasten the three black self-tapping screws onto the ceiling, as shown in Figure 6-10. Huawei Proprietary and Confidential Issue 03 (2013-02-28) Copyright © Huawei Technologies Co., Ltd...
  • Page 60 Step 6 Lock the inner liner on the bracket and use the T15 star L-wrench to fasten the three star screws on the upper cover, as shown in Figure 6-11. Huawei Proprietary and Confidential Issue 03 (2013-02-28) Copyright © Huawei Technologies Co., Ltd...
  • Page 61: Installing The Ipc On The Wall

    You can install the IPC on a wall using the white lower cover or directly through the black module base, as shown in Figure 6-12. In this case, the side cable cabling mode is often used. Huawei Proprietary and Confidential Issue 03 (2013-02-28) Copyright © Huawei Technologies Co., Ltd...
  • Page 62: Installing The Ipc On A Wall-Mounted Bracket

    This type of dome IPC can be installed on the wall using a wall-mounted bracket, as shown in Figure 6-13. This installation mode increases the application scope of the IPC. Huawei Proprietary and Confidential Issue 03 (2013-02-28) Copyright © Huawei Technologies Co., Ltd...
  • Page 63 NOTE For details about how to disassemble the dome IPC, see Step 1 and Step 2 in section 6.2.1 "Installing the IPC on the Ceiling." Huawei Proprietary and Confidential Issue 03 (2013-02-28) Copyright © Huawei Technologies Co., Ltd...
  • Page 64 Figure 6-15. (Spare screws are available in the accessory kit of the wall-mounted bracket.) Figure 6-15 Fixing the black lower cover of the IPC onto the bracket Multi connector cable Black screws Huawei Proprietary and Confidential Issue 03 (2013-02-28) Copyright © Huawei Technologies Co., Ltd...
  • Page 65 Hold the bracket with one hand, and align the four holes on the lower cover with the four expansion particles installed on the wall. Use the four black self-tapping screws to fix the bracket on the wall, as shown in Figure 6-17. Huawei Proprietary and Confidential Issue 03 (2013-02-28) Copyright © Huawei Technologies Co., Ltd...
  • Page 66 If the module is found loose after the video adjustment is complete, fasten the screws on the module again and then install the inner liner and upper cover of the dome IPC. Huawei Proprietary and Confidential Issue 03 (2013-02-28) Copyright © Huawei Technologies Co., Ltd...
  • Page 67: Installing The Ipc On A Ceiling-Mounted Bracket

    6.2.4 Installing the IPC on a Ceiling-Mounted Bracket The IPC can be installed on a bracket that is mounted on the indoor ceiling or under the roof, as shown in Figure 6-19. Huawei Proprietary and Confidential Issue 03 (2013-02-28) Copyright © Huawei Technologies Co., Ltd...
  • Page 68 NOTE For details about how to disassemble the dome IPC, see Step 1 and Step 2 in section 6.2.1 "Installing the IPC on the Ceiling." Huawei Proprietary and Confidential Issue 03 (2013-02-28) Copyright © Huawei Technologies Co., Ltd...
  • Page 69 Figure 6-21. (Spare screws are available in the accessory kit of the ceiling-mounted bracket.) Figure 6-21 Fixing the module onto the bracket Three black screws Multi connector cable Huawei Proprietary and Confidential Issue 03 (2013-02-28) Copyright © Huawei Technologies Co., Ltd...
  • Page 70 Hold the bracket with one hand, and align the four holes on the lower cover with the four expansion particles installed on the ceiling. Use the four black self-tapping screws to fix the bracket on the ceiling, as shown in Figure 6-23. Huawei Proprietary and Confidential Issue 03 (2013-02-28) Copyright © Huawei Technologies Co., Ltd...
  • Page 71 If the module is found loose after the video adjustment is complete, fasten the screws on the module again and then install the inner liner and upper cover of the dome IPC. Huawei Proprietary and Confidential Issue 03 (2013-02-28) Copyright © Huawei Technologies Co., Ltd...
  • Page 72 6 Installing an Infrared Do me IPC Figure 6-24 Install the inner liner and upper cover of the dome IPC Horizontally rotating Vertically rotating Inner liner Upper cover ----End Huawei Proprietary and Confidential Issue 03 (2013-02-28) Copyright © Huawei Technologies Co., Ltd...
  • Page 73: Installing A Day & Night High Speed Dome Ipc

    Table 7-1 Installation tools and accessories Tool Appearance Remark Phillips screwdriver Prepared by yourself Claw hammer Percussion drill Horizontal ruler Expansion bolt Gloves Delivered with the IPC Huawei Proprietary and Confidential Issue 03 (2013-02-28) Copyright © Huawei Technologies Co., Ltd...
  • Page 74 If the IPC is installed on the wall, two types of brackets can be used. The following section describes the installation procedures when the two types of brackets are used. Huawei Proprietary and Confidential Issue 03 (2013-02-28) Copyright © Huawei Technologies Co., Ltd...
  • Page 75 IPC. Then, lock three screws between the bracket and the IPC, as shown in Figure 7-2. Huawei Proprietary and Confidential Issue 03 (2013-02-28) Copyright © Huawei Technologies Co., Ltd...
  • Page 76 Figure 7-3 Installing the cover plate of the bracket Step 7 Fasten the thumb screw, as shown in Figure 7-4. Huawei Proprietary and Confidential Issue 03 (2013-02-28) Copyright © Huawei Technologies Co., Ltd...
  • Page 77 Use a percussion drill bit with a diameter of 8 mm to drill four holes that are 60 mm deep. Figure 7-5 shows the installation dimensions (in the unit of mm) of the bracket. Huawei Proprietary and Confidential Issue 03 (2013-02-28) Copyright © Huawei Technologies Co., Ltd...
  • Page 78 Step 3 Drive four expansion bolts into the holes. Step 4 Route the multi-connector cable through the wall-mounted bracket, as shown in Figure 7-6. Figure 7-6 Routing the cable of the IPC through the bracket Huawei Proprietary and Confidential Issue 03 (2013-02-28) Copyright © Huawei Technologies Co., Ltd...
  • Page 79 Use a percussion drill bit with a diameter of 8 mm to drill four holes that are 60 mm deep. Figure 7-8 shows the installation dimensions (in the unit of mm) of the bracket. Huawei Proprietary and Confidential Issue 03 (2013-02-28) Copyright © Huawei Technologies Co., Ltd...
  • Page 80 Step 4 Route the multi-connector cable through the ceiling-mounted bracket assembly, as shown in Figure 7-9. Figure 7-9 Routing the cable of the IPC through the bracket Huawei Proprietary and Confidential Issue 03 (2013-02-28) Copyright © Huawei Technologies Co., Ltd...
  • Page 81 Step 1 Keep the transparent dome of the IPC upward. Rotate the dome anticlockwise to open the dome. Take out the foam and remove the protective film on the transparent dome. Then, rotate the dome clockwise to install the dome. Huawei Proprietary and Confidential Issue 03 (2013-02-28) Copyright © Huawei Technologies Co., Ltd...
  • Page 82 Figure 7-12 Fixing the main body of the high-speed dome IPC onto the bracket Step 4 Cut a hole with a diameter of 240 mm on the suspended ceiling. The diameter error is 2 mm. Huawei Proprietary and Confidential Issue 03 (2013-02-28) Copyright © Huawei Technologies Co., Ltd...
  • Page 83 Step 6 Mount the plastic decorative cover onto the main body of the IPC. Rotate the cover clockwise to fix it onto the bracket, as shown in Figure 7-15. Figure 7-15 Installing the plastic decorative cover ----End Huawei Proprietary and Confidential Issue 03 (2013-02-28) Copyright © Huawei Technologies Co., Ltd...
  • Page 84 Table 8-1 Installation tools and accessories Tool Appearance Remark Phillips screwdriver Prepared by yourself Claw hammer Percussion drill Horizontal ruler Expansion bolt Gloves Delivered with the IPC Huawei Proprietary and Confidential Issue 03 (2013-02-28) Copyright © Huawei Technologies Co., Ltd...
  • Page 85 If the IPC is installed on the wall, two types of brackets can be used. The following section describes the installation procedures when the two types of brackets are used. Huawei Proprietary and Confidential Issue 03 (2013-02-28) Copyright © Huawei Technologies Co., Ltd...
  • Page 86 IPC. Then, lock three screws between the bracket and the IPC, as shown in Figure 8-2. Huawei Proprietary and Confidential Issue 03 (2013-02-28) Copyright © Huawei Technologies Co., Ltd...
  • Page 87 Step 1 Determine the positions of installation holes based on the installation dimensions of the bracket and mark the holes. Use a percussion drill bit with a diameter of 8 mm to drill four Huawei Proprietary and Confidential Issue 03 (2013-02-28) Copyright © Huawei Technologies Co., Ltd...
  • Page 88 Figure 8-4 Installation dimensions of the bracket Step 2 Drive four expansion bolts into the holes. Step 3 Route the multi-connector cable through the bracket, as shown in Figure 8-5. Huawei Proprietary and Confidential Issue 03 (2013-02-28) Copyright © Huawei Technologies Co., Ltd...
  • Page 89 IPC. Then, lock three screws between the bracket and the IPC, as shown in Figure 8-6. Figure 8-6 Fixing the IPC onto the bracket Huawei Proprietary and Confidential Issue 03 (2013-02-28) Copyright © Huawei Technologies Co., Ltd...
  • Page 90 Figure 8-7 Determining the positions of installation holes Step 2 Drive four expansion bolts into the holes. Step 3 Route the multi-connector cable through the ceiling-mounted bracket, as shown in Figure 8-8. Huawei Proprietary and Confidential Issue 03 (2013-02-28) Copyright © Huawei Technologies Co., Ltd...
  • Page 91 IPC. Then, lock three screws between the bracket and the IPC, as shown in Figure 8-9. Huawei Proprietary and Confidential Issue 03 (2013-02-28) Copyright © Huawei Technologies Co., Ltd...
  • Page 92 8 Installing an Infrared High Speed Do me IPC Figure 8-9 Fixing the IPC onto the bracket Step 5 Install the assembled high-speed dome IPC on the ceiling and fasten the four screws. ----End Huawei Proprietary and Confidential Issue 03 (2013-02-28) Copyright © Huawei Technologies Co., Ltd...

Table of Contents