Basic Operations; Monitor/Operation; Screen Sequence - Mitsubishi Electric AE-200A Instruction Book

Air conditioning control system centralized controller
Hide thumbs Also See for AE-200A:
Table of Contents

Advertisement

3. Basic operations

3-1. Monitor/Operation

This section explains how to monitor and operate the unit groups.

3-1-1. Screen sequence

[Floor] display (zoomed-in)
Touch [Floor].
Touch [Block].
[Block] display
[Measurement] display
* The [Measurement] tab will appear only when an AI or PI controller is connected or when the AE-200 built-in Pulse Input (PI) is enabled.
[HWHP] display
* The [HWHP] tab will appear only when an HWHP (CAHV, CRHV) unit is connected.
[AHC] display
WT07992X02
Touch [
].
Touch [
].
Select a group and
touch [Operate].
Touch [OK] or
[Cancel].
Select a group and
touch [Operate].
Touch [OK] or [Cancel].
Touch [Block].
Touch [EM Block].
Select a group and
touch [Operate].
Touch [OK] or [Cancel].
11
[Floor] display (zoomed-out)
Operation settings screen
Operation settings screen

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ae-50aAe-200eAe-50e

Table of Contents