Powering Up; Screen Matrix Format After Power Up - GE Moisture Image Series 1 Startup Manual

Hygrometer
Hide thumbs Also See for Moisture Image Series 1:
Table of Contents

Advertisement

June 2003

Powering Up

2-2
Artisan Technology Group - Quality Instrumentation ... Guaranteed | (888) 88-SOURCE | www.artisantg.com
The Series 1 has a universal power supply that automatically adjusts
to line voltages from 90 to 260 VAC. After making electrical
connections (including grounding) as described in Chapter 1,
Installation, press the power switch to power up the meter.
Note: The AC power cord is the main disconnect device.
IMPORTANT: For compliance with the EU's Low Voltage Directive
(IEC 1010), this unit requires an external power
disconnect device such as a switch or circuit breaker.
The disconnect device must be marked as such,
clearly visible, directly accessible, and located
within 1.8 m (6 ft) of the unit.
Do not operate the Delta F oxygen cell for extended
periods of time at oxygen concentrations that are over
range. Trace and low percent range sensors may be
damaged if exposed to high levels of oxygen, such as
air, for long periods (>1 hour) while the Series 1 is on.
If exposure is unavoidable, either disconnect the
oxygen cell from the Series 1 or equip the sample
system with a valve that allows the cell to be switched
If the unit passes its self-test, the screen begins displaying
measurements in a matrix format similar to the one shown in
Figure 2-1 below.
1 Dew Point
-18.0 °C
2 Temperature
+35.9 °C
3
H
O
2
+0.535 ppm
Main Menu
HELP
SELECT
Figure 2-1: Screen Matrix Format After Power Up
Caution!
to purge gas.
4 Oxygen
48.3 ppb
v
5 Pressure
27.10 PSIg
X Unassigned
v
11:35 01/22/2000
SETTINGS
OPTIONS
pg: 1
Initial Setup

Advertisement

Table of Contents
loading

Table of Contents