PDU8000 Modular Integrated PDC V1.0
User Manual
5 Installation Guide
Figure 5-28 Connecting air conditioner output power cables for the PDC
Step 3 Connect the light power cables to the terminals of light output circuit breakers in the PDC.
Issue 07 (2019-04-15)
Copyright © Huawei Technologies Co., Ltd.
46