PDU8000 Modular Integrated PDC V1.0
User Manual
Figure 5-23 Positions for binding cables inside the PDC
(1) Position for binding cables
5.5.2 Connecting the Ground Cable for the PDC
Procedure
Step 1 Lay out the ground cable based on the position of the ground grid or busbar and the onsite
cabling mode.
Step 2 Secure one end of the ground cable to the ground bar inside the PDC, and secure the other end
to the ground grid or busbar of the equipment room.
Issue 07 (2019-04-15)
Copyright © Huawei Technologies Co., Ltd.
5 Installation Guide
41