Servicing the Fuse
1.
Park the machine on a level surface.
2.
Raise the loader arms and install the cylinder
locks.
3.
Shut off the machine and remove the key.
4.
Remove the hood; refer to
(page
28).
5.
Disconnect the main power to the machine; refer
to
Disconnecting the Main Power (page
6.
Locate the fuse and replace it
Figure 33
7.
Torque the nuts to 12 to 18 N∙m (9 to 13 ft-lb).
8.
Connect the main-power connectors.
9.
Install the front cover.
Removing the Hood
29).
(Figure
33).
g304512
32
Drive System
Maintenance
Checking the Tire Treads
Service Interval: Before each use or daily
Check the tire treads for wear. Replace the tires when
the treads are worn and shallow.
Checking the Wheel-Lug
Nuts
Service Interval: After the first 8 hours
Every 100 hours
Check and torque the wheel lug nuts to 68 N∙m (50
ft-lb).