Acceptance Guide - Huawei PDU8000 Series User Manual

Modular precision power distribution cabinet
Hide thumbs Also See for PDU8000 Series:
Table of Contents

Advertisement

PDU8000 Modular Precision Power Distribution Cabinet
User Manual
Packing List
The packing materials of a modular precision PDC include:
Unpacking and Accepting Goods
Step 1 Check whether the tiltwatch indicator on the carton has turned red. If yes, record the
information and contact the equipment carrier and the local Huawei office immediately.
Step 2 Visually inspect the equipment appearance to check whether the equipment is paint-peeling,
misshapen, scratched, or soaked. If yes, record the information and contact the equipment
carrier and the local Huawei office immediately.
Step 3 Check against the delivery list that the equipment and fittings are correct and complete. If
some fittings are missing or do not comply with the models in the packing list, record the
information and contact the local Huawei office immediately.
----End
Removing the Package
Step 1 Move the PDC to the specified installation position using a forklift.
Issue 02 (2016-11-10)
Wooden pallet
Moisture-proof plastic bag
Corner protector
Carton
Cushion foam
If any damage is found, report it to the carrier immediately.
After the equipment is delivered to the installation site, representatives from the customer
and Huawei unpack and inspect the equipment together.
Move the cabinet with caution to avoid bumping or toppling. To avoid damaging the
equipment, exercise caution when removing the packing materials.
Copyright © Huawei Technologies Co., Ltd.
4

Acceptance Guide

4 Acceptance Guide
28

Advertisement

Table of Contents
loading

Table of Contents