6.1 Check Before Power-on Commissioning

Table 6-1 Hardware installation checklist
No.
1
2
3
4
5
Table 6-2 Electrical connection checklist
No.
1
2
3
4
5
6
Issue 02 (2016-11-10)
6
Check Item
The cabinet is clean and free of dust, dirt, copper cuttings,
and foreign matter.
The paint on the cabinet exterior is intact.
The cabinet door and lock work properly.
All labels are correct, clear, and complete.
The surrounding area of the cabinet contains no waste tape,
cable ties, paper, or packing materials.
Check Item
All cables are connected properly.
The ground cable is connected properly.
The excessive sections of ground cables and power cables
are cut off.
Phase cables are connected properly.
Power cables and ground cables are routed and bundled
separately from other types of cables.
All circuit breakers are OFF.
Copyright © Huawei Technologies Co., Ltd.

Commissioning Guide

6 Commissioning Guide
Result
□Yes □No
□Yes □No
□Yes □No
□Yes □No
□Yes □No
Result
□Yes □No
□Yes □No
□Yes □No
□Yes □No
□Yes □No
□Yes □No
58

Advertisement

Table of Contents
loading

Table of Contents