Guidelines for Cable Connections
The procedure for cable connections is as follows:
Figure 59. Cable Connection Procedure
Cable Path Inspection
Cable Cutting
Cable Installation
Connector Attachment
Cable Binding
Identification Tag Attachment
When cutting the cable after installation, make sure that the connector is
disconnected. Installation of the cable with the connector connected to the system
may cause contact failure or damage to the connector assembled to the system and
the cable due to cable tension or the operator's mistakes.
The sequence of cable cutting and installation of the cable workflow can be
changed depending on the field situation such as 'cutting after installing' or
'installing after cutting'.
Cable Path Inspection
When installing a cable that connects between the rectifier, Main Ground Bar
(MGB), and backhaul device, and so on within the system, the cable path, length
and the cable installation method, and so on must be inspected.
Follow these guidelines when inspecting the cabling path.
A minimum cable length must be selected provided that it does not affect the
cable installation and maintenance.